My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stockton Maintenance Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-07-01) Citywide Custodial Services
>
Responses
>
Stockton Maintenance Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2015 11:01:50 AM
Creation date
8/7/2015 11:01:44 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Citywide Custodial Services
Bid No. (xx-xx-xx)
15-07-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> 0 <br /> O <br /> Quality Control Plan <br /> e In this section SMG has provided an overview of its Quality Control Plan (QCP). Our QCP describes <br /> our proposed quality control processes/procedures/practices. The description addresses all aspects of <br /> Q quality control including: <br /> 0 • caliber of personnel <br /> ® • line responsibility <br /> • adequacy of procedures, inspection, equipment and organization <br /> ® • capability to perform <br /> 0 • amount of work to be inspected and frequency of inspections <br /> a • process for acceptance, rejection, documentation and resolution of deficiencies <br /> A • trend analysis <br /> • corrective action to identify substandard performance <br /> 0 • interface with our Clients inspectors <br /> 0 <br /> ® Our goal is to evidence the acceptability of our QCP by addressing the essential items in sufficient <br /> ® detail to indicate that we have a thorough understanding and reasonable approach to properly <br /> managing. Finally, SMG proposes the following as it relates to our QCP: <br /> ® i. it will become a compliance document upon contract award <br /> • <br /> ii. it will remain in effect for the life of the contract <br /> iii. it will be changed/updated as-needed/required <br /> ® a. Responsibility for Surveillance of Work. <br /> ® Responsibility for daily inspection/surveillance of workmanship will rest with our Area Supervisor and <br /> Project Manager. Our Quality Assurance Manager and Quality Assurance Inspector will make <br /> ® regularly scheduled inspections to ensure the level of quality remains consistent with our client's <br /> ® expectations. Finally, as an additional level of surveillance, other corporate staff will perform random <br /> ® periodic on-site inspections. <br /> 0 <br /> • <br /> 0 <br /> • CITY WIDE CUSTODIAL SERVICE. SUNNY ILSES BEACH FLORIDA <br />
The URL can be used to link to this page
Your browser does not support the video tag.