My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stockton Maintenance Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-07-01) Citywide Custodial Services
>
Responses
>
Stockton Maintenance Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2015 11:01:50 AM
Creation date
8/7/2015 11:01:44 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Citywide Custodial Services
Bid No. (xx-xx-xx)
15-07-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> 0 <br /> o b. Trend Analysis <br /> 0 <br /> ® Trend analysis will be accomplished to identify substandard work by relying on inspection results. <br /> ® The primary tool is visual inspections of in-progress and completed work. The primary method will be <br /> ® evaluating/analyzing inspection results measured against objective performance standards. The results <br /> will then be analyzed to identify negative/downward trends in performance. <br /> 0 <br /> ® The appropriate corrective action will be determined by two items: 1.) the inspection results and 2.) <br /> ® Trend identified. Depending on/considering these items, corrective action will be anything from <br /> ® increased inspections to termination/replacement of individual(s) responsible. <br /> O c. Corrective Action to Identify Substandard Performance <br /> ® In the following narrative, SMG provides a discussion of our proposed quality control: <br /> 0® r methods <br /> > reports <br /> 0 > resolution actions <br /> ® d. Methods <br /> ® SMG relies on two quality control methods. Each is discussed briefly below. <br /> ® Surveillance/Inspections (e.g., visual) — This is the primary quality control tool/method used to ensure <br /> ® adherence to performance standards (quality of workmanship & timeliness). The two keys to the <br /> success of this tooUmethod are: 1.) identification/establishment of objective, quantifiable/verifiable <br /> ® standards upon which performance can be measured and 2.) Varying levels (e.g., formality & <br /> ® frequency) of inspections. <br /> ® The identification/establishment of objective, quantifiable and verifiable standards upon which <br /> O performance can be measured form the baseline for determining acceptability of performance. These <br /> ® standards also help identify trends (positive & negative) in performance. <br /> 0 <br /> 0 <br /> ® CITY WIDE CUSTODIAL SERVICE, SUNNY ILSES BEACH FLORIDA <br />
The URL can be used to link to this page
Your browser does not support the video tag.