F. Related Experience
<br />City of Sunny Isles Beach | Request for Qualifications No. 15-08-02
<br />September 23, 2015
<br />Page 11
<br />PROJECT
<br />NAME
<br />DELIVERY
<br />METHOD SCOPE OF WORK REFERENCE INFORMATION
<br />(Owner & Architect)
<br />CONSTRUCTION
<br />COST SIZE
<br />START DATE /
<br />COMPLETION
<br />DATE
<br />STATUS
<br />PROFESSIONALS
<br />ASSIGNED TO
<br />THIS CONTRACT
<br />7th Special
<br />Forces
<br />Complex
<br />Eglin Air Force
<br />Base, FL
<br />Design-
<br />Bid-Build
<br />Construction of group headquarters, battalion
<br />headquarters/company operations facility,
<br />combat readiness training facility, group
<br />support battalion headquarters/company
<br />operations facility, and dining hall. Includes
<br />clearing, grubbing, grading and stabilization
<br />of 350-acre containment site and 130-acre
<br />access road, and construction of a road
<br />system and infrastructure.
<br />OWNER: USACE Mobile
<br />Robert Schodlbauer, Project Manager
<br />109 St. Joseph St, P.O. Box 2288 Mobile, AL 36628-0001
<br />251.471.5966 |
<br />robert.a.schodlbauer@sam.usace.army.mil
<br />ARCHITECT: Bullock Tice Associates
<br />Larry Adams, Asociate Partner
<br />909 E. Cervantes, St, Pensacola, FL 32501
<br />850.434.5444 | l.adams@bulltice.com
<br />$178.7 Million 684,061 SF February 2009 /
<br />August 2011 Complete Derek Hoffine
<br />FORSCOM
<br />/ USARC
<br />Combined
<br />Headquarters
<br />Ft. Bragg, NC
<br />Design-Build
<br />Design-Build, 708,000 SF headquarters
<br />complex on 57-acre site. Contains command
<br />headquarters building and four remote
<br />buildings housing administration, information
<br />management, control information technology,
<br />and a disaster recovery center. Project is
<br />designed to achieve LEED silver certification.
<br />OWNER: USACE Savannah
<br />Daniel Davis, Ft. Bragg Area Engineer
<br />Bldg 3-1933 Butner Road, PO Box 70247 Ft. Bragg,
<br />NC 28307
<br />910.303.9950 | daniel.h.davis@usace.army.mil
<br />ARCHITECT: Fentress Architects
<br />Brian Chaffee, Principal-in-Charge
<br />1140 Connecticut Avenue, Ste 750, Washington DC
<br />20036
<br />202.337.5100 | chaffee@fentressarchitects.com
<br />$304.2 Million 708,000 SF October 2008 /
<br />June 2011 Complete N/A
<br />Military
<br />Department
<br />Investigative
<br />Agencies
<br />(MDIA)
<br />Headquarters
<br />- Russell-
<br />Knox Building
<br />Quantico MCB,
<br />VA
<br />Design-Build
<br />Design-build, 718,854 SF facility with five
<br />different military investigative agencies.
<br />Three-story facility with training areas,
<br />laboratories, cafeteria, fitness center, logistics
<br />building, and a central plant. Also includes
<br />visitor centers, guard houses, vehicle
<br />inspection areas, and 2,624 parking spaces.
<br />Designed for LEED silver certification.
<br />OWNER: NAVFAC Washington
<br />David Kiefer, Project Manager
<br />1322 Patterson Ave. SE, Suite 100, Washington
<br />Navy Yard, D.C. 20374-5065
<br />703.784.6968 | dave.w.kiefer@navy.mil
<br />ARCHITECT: Fentress Architects
<br />Brian Chaffee, Principal-in-Charge
<br />1140 Connecticut Avenue, Ste 750, Washington DC
<br />20036
<br />202.337.5100 | chaffee@fentressarchitects.com
<br />$366.5 Million 718,854 SF December 2008 /
<br />October 2010 Complete N/A
<br />Relevant Projects Completed in the Last Five Years
|