F. Related Experience
<br />City of Sunny Isles Beach | Request for Qualifications No. 15-08-02
<br />September 23, 2015
<br />Page 12
<br />PROJECT
<br />NAME
<br />DELIVERY
<br />METHOD SCOPE OF WORK REFERENCE INFORMATION
<br />(Owner & Architect)
<br />CONSTRUCTION
<br />COST SIZE
<br />START DATE /
<br />COMPLETION
<br />DATE
<br />STATUS
<br />PROFESSIONALS
<br />ASSIGNED TO
<br />THIS CONTRACT
<br />South Airport
<br />Automated
<br />People
<br />Mover (APM)
<br />Complex
<br />Orlando, FL
<br />CM@Risk
<br />The South Airport APM Complex is a multi-
<br />year program. The scope of the program
<br />includes a 2,400-car parking garage,
<br />the South Airport APM Complex station,
<br />renovation of the APM station in the North
<br />Terminal, completion of the APM guideway
<br />structure to the South Airport APM Complex
<br />station, modifications to the APM guideway
<br />structures (fixed facilities only) to Airsides 1
<br />and 3, roadways, bridges, sitework, and all
<br />associated infrastructure.
<br />OWNER: AECOM
<br />John Guirges, Program Manager
<br />11074 Canal Road, Orlando, FL 32824
<br />407.825.4059 | John.Guirges@urs.com
<br />ARCHITECT: HKS Architects
<br />Dave Thomas, Vice President & Project Manager
<br />225 E Robinson St # 405, Orlando, FL 32801
<br />407.648.9956 | DThomas@hksinc.com
<br />$292 Million 1,291,385 SF October 2014 /
<br />April 2018 In Progress N/A
<br />NASA
<br />Headquarters
<br />Building
<br />Kennedy Space
<br />Center, FL
<br />Design-
<br />Bid-Build
<br />The scope of work for this project will include
<br />the construction of an eight-story, 200,000
<br />SF building with the first floor housing a
<br />cafeteria with an indoor/outdoor seating area,
<br />a credit union, barber shop, post office, large
<br />lobby with displays, gift shop, library and
<br />other services. Floors two through seven will
<br />include offices, conference rooms and break
<br />areas, topped off by an eighth floor housing
<br />mechanical support systems.
<br />OWNER: National Aeronautics and Space
<br />Administration(NASA)
<br />Anthony Caruvana, Contracting Officer
<br />Mail Code OP-ES-B Kennedy Space Center FL
<br />32899
<br />321.867.3464 | anthony.m.caruvana@nasa.gov
<br />ARCHITECT: Hunton Brady
<br />Phil Randall, Construction Administrator
<br />800 Magnolia Ave #600, Orlando FL 32803
<br />407-621-1600 | prandall@huntonbrady.com
<br />$64.9 Million 200,000 SF December 2014 /
<br />December 2016 In-Progress Dave Morin
<br />Navy Federal
<br />Credit Union
<br />Phase I
<br />Expansion
<br />Pensacola, FL
<br />CM@Risk
<br />This project will include one 3-story, multi-
<br />wing office building, a central energy plant,
<br />a parking deck, surface parking areas,
<br />and associated connecting bridges, roads,
<br />walking paths, stormwater retention and
<br />infrastructure.
<br />OWNER: Navy Federal Credit Union
<br />George Eichert, PE, SVP, Admin Services
<br />820 Follin Lane, Vienna, VA 22180
<br />703.255.8509 | george_eichert@navyfederal.org
<br />ARCHITECT: ASD Architects
<br />Glenn Cartledge, Principal, AIA
<br />55 Ivan Allen Jr Blvd NW #100, Atlanta, GA 30308
<br />404.688.3318 | gcartledge@asdnet.com
<br />$172 Million 554,153 SF July 2014 /
<br />July 2016 In Progress N/A
<br />All Projects in Florida, Exceeding $1 Million, that Started in the Past 5 Years
<br />Below and on the following pages you will find Hensel Phelps’ list of projects in the state of Florida that have exceed $1 Million in construction cost and started in the past 5 years.
|