Laserfiche WebLink
50. What is the intent for existing drainage lines? <br /> As general information. <br /> 51. If contractor finds a drainage pipe and it is not in specs will it be left alone? <br /> YES. Unless otherwise indicated by the engineer. <br /> 52. All existing pipes in specs to be removed or abandoned? If not specified should it be left <br /> untouched? <br /> YES, Unless otherwise indicated by the engineer. <br /> 53. Will contractor be cutting and gutting pipes in specs? <br /> YES. <br /> 54. When will addendum be issued? <br /> In approximately five (5) days along with copies of the sign-in sheets, and summary <br /> minutes of today's meeting. <br /> 55. Any known utility conflicts? <br /> NO, no known conflicts. <br /> The Pre-Bid Conference was concluded at 11:10 a.m. <br /> List of Plans dated 11-7-07, revised as per Addendum No. 1 <br /> • General Notes and Miscellaneous Details Sheet 5 <br /> • Summary of Quantities Sheet 6 <br /> • Plan and Profile North Bay Road Sheet 11 <br /> • Plan and Profile North Bay Road Sheet 15 <br /> • Plan and Profile North Bay Road Sheet 16 <br /> • Plan and Profile NE 175th Terrace Sheet 19 <br /> • Plan and Profile NE 178th Dr. Sheet 24 <br /> • Plan and Profile NE 178th Dr. Sheet 25 <br /> • Plan and Profile Church Dr. Sheet 26 <br /> • Plan and Profile NE 177th Dr. Sheet 27 <br /> • Plan and Profile NE 180th Dr. Sheet 30 <br /> • Plan and Profile NE 180th Dr. Sheet 31 <br /> • Plan and Profile NE 181st Dr. Sheet 32 <br /> • Drainage Structures Sheet 34 <br /> • Drainage Structures Sheet 35 <br /> • Drainage Details Sheet 36 <br /> • Drainage Details Sheet 37 <br /> • Cross Sections North Bay Road Sheet 51 <br /> • Cross Sections North Bay Road Sheet 52 <br /> List of Bid Forms revised per Addendum No. 1 <br /> Revised Section 300, BID FORM, sheet 1, 2 and 3 <br /> Bid 07-10-02 Pre-Bid Conference QA Page 6 of 6 <br /> ■ <br />