My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2459
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2459
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 11:42:01 AM
Creation date
10/12/2015 4:21:53 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2459
Date (mm/dd/yyyy)
09/17/2015
Description
Ratify Agmt w/ Perkins+Will for Arch. Design Srvcs for a New BLDG at 18080 Collins
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br /> (305) 947-0606 phone (305) 949-3113 Fax <br /> THE OWNER AGREES TO PAY THE ARCHITECT AS COMPENSATION FOR HIS <br /> SERVICES: <br /> 2.1 For his Basic Services prescribed in Article 3 hereinafter, the lump sum amount of <br /> $2,222,000.00 (Two Million Two Hundred Twenty Two Thousand Dollars), to be paid <br /> as prescribed in Article 9.1 hereinafter. <br /> 2.2 For Additional Services defined in Article 4 hereinafter to be paid as a Lump Sum, the <br /> Lump Sum prescribed in the authorization. Exhibit "F" identifies allowances for proposed <br /> additional services. <br /> 2.3 Reimbursable expense as defined in Article 8 hereinafter, not exceeding the limits of <br /> Section 112.061 of the Florida Statutes. <br /> ARTICLE 3 <br /> ARCHITECT'S BASIC SERVICES <br /> 3.1 THE ARCHITECT AGREES TO PROVIDE BASIC PROFESSIONAL SERVICES <br /> FOR THE PROJECT AS HEREINAFTER SET FORTH. <br /> 3.2 SCHEMATIC DESIGN PHASE <br /> (1) The Architect shall prepare, from the approved Programming Phase Documents, <br /> the Schematic Design Studies to achieve a design solution acceptable to the Owner. <br /> The Design Studies shall consist of sketches, concepts, organization, orientation, <br /> relationship to existing and future facilities, energy conservation approaches and <br /> equipment parameters necessary to clearly define the general scope and direction <br /> of the Project. <br /> (2) The Architect shall provide the Schematic Design Studies to the Contractor and <br /> provide to the Owner a review and comments of the Contractor's estimates. <br /> (3) The Architect shall provide and distribute 10 hard (paper) copies and one (1) <br /> electronic copy of the Schematic Design Studies Documents for review and <br /> comment as directed by the Project Director. <br /> - <br /> CI4U- PERKINS& WILL ARCHITECTS INC. 3 �-' r <br />
The URL can be used to link to this page
Your browser does not support the video tag.