My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment A - 2015-3-13_Samson Park Technical Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment A - 2015-3-13_Samson Park Technical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:00:19 AM
Creation date
11/12/2015 9:46:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMSON OCEANFRONT PARK <br />CITY OF SUNNY ISLES <br />TECHNICAL SPECIFICATIONS <br /> <br /> PLUMBING PIPING INSULATION 15085-9 <br /> <br /> <br /> <br />3.05 <br /> <br />INSTALLATION OF CELLULAR-GLASS INSULATION: <br />A. Insulation Installation on Straight Pipes and Tubes: <br />1. Secure each layer of insulation to pipe with wire or bands and tighten bands without <br /> deforming insulation materials. <br />2. Where vapor barriers are indicated, seal longitudinal seams, end joints, and protrusions with <br /> vapor-barrier mastic and joint sealant. <br />3. For insulation with factory-applied jackets on above-ambient services, secure laps with <br /> outward clinched staples at 6 inches <br />4. For insulation with factory-applied jackets on below-ambient services, do not staple <br /> o.c. <br /> longitudinal tabs. Instead, secure tabs with additional adhesive as recommended by insulation <br /> material manufacturer and seal with vapor-barrier mastic and flashing sealant. <br /> <br />B. Insulation Installation on Pipe Flanges: <br />1. Install preformed pipe insulation to outer diameter of pipe flange. <br />2. Make width of insulation section same as overall width of flange and bolts, plus twice the <br /> thickness of pipe insulation. <br />3. Fill voids between inner circumference of flange insulation and outer circumference of <br /> adjacent straight pipe segments with cut sections of cellular-glass block insulation of same <br /> thickness as pipe insulation. <br />4. Install jacket material with manufacturer’s recommended adhesive, overlap seams at least 1 <br /> inch <br /> <br />, and seal joints with flashing sealant. <br />C. Insulation Installation on Pipe Fittings and Elbows: <br /> <br />1. Install preformed sections of same material as straight segments of pipe insulation when <br /> available. Secure according to manufacturer’s written instructions. <br />2. When preformed sections of insulation are not available, install mitered sections of cellular- <br /> glass insulation. Secure insulation materials with wire or bands. <br /> <br />D. Insulation Installation on Valves and Pipe Specialties: <br />1. Install preformed sections of cellular-glass insulation to valve body. <br />2. Arrange insulation to permit access to packing and to allow valve operation without <br /> disturbing insulation. <br />3. Install insulation to flanges as specified for flange insulation application. <br /> <br />3.06 <br /> <br />INSTALLATION OF FLEXIBLE ELASTOMERIC INSULATION: <br />A. Seal longitudinal seams and end joints with manufacturer’s recommended adhesive to eliminate <br /> openings in insulation that allow passage of air to surface being insulated. <br /> <br />B. Insulation Installation on Pipe Flanges: <br />1. Install pipe insulation to outer diameter of pipe flange. <br />2. Make width of insulation section same as overall width of flange and bolts, plus twice the <br /> thickness of pipe insulation. <br />3. Fill voids between inner circumference of flange insulation and outer circumference of <br /> adjacent straight pipe segments with cut sections of sheet insulation of same thickness as pipe <br /> insulation. <br />4. Secure insulation to flanges and seal seams with manufacturer’s recommended adhesive to <br /> eliminate openings in insulation that allow passage of air to surface being insulated. <br /> <br />C. Insulation Installation on Pipe Fittings and Elbows: <br />1. Install mitered sections of pipe insulation. <br />2. Secure insulation materials and seal seams with manufacturer’s recommended adhesive to <br /> eliminate openings in insulation that allow passage of air to surface being insulated.
The URL can be used to link to this page
Your browser does not support the video tag.