My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment A - 2015-3-13_Samson Park Technical Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment A - 2015-3-13_Samson Park Technical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:00:19 AM
Creation date
11/12/2015 9:46:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMSON OCEANFRONT PARK <br />CITY OF SUNNY ISLES <br />TECHNICAL SPECIFICATIONS <br /> <br /> PLUMBING PIPING INSULATION 15085-10 <br /> <br /> <br /> <br />D. Insulation Installation on Valves and Pipe Specialties: <br />1. Install preformed valve covers manufactured of same material as pipe insulation when <br /> available. <br />2. When preformed valve covers are not available, install cut sections of pipe and sheet <br /> insulation to valve body. Arrange insulation to permit access to packing and to allow valve <br /> operation without disturbing insulation. <br />3. Install insulation to flanges as specified for flange insulation application. <br />4. Secure insulation to valves and specialties and seal seams with manufacturer’s recommended <br /> adhesive to eliminate openings in insulation that allow passage of air to surface being <br /> insulated. <br /> <br />3.07 <br /> <br />INSTALLATION OF MINERAL-FIBER PREFORMED PIPE INSULATION: <br />A. Insulation Installation on Straight Pipes and Tubes: <br />1. Secure each layer of preformed pipe insulation to pipe with wire or bands and tighten bands <br /> without deforming insulation materials. <br />2. Where vapor barriers are indicated, seal longitudinal seams, end joints, and protrusions with <br /> vapor-barrier mastic and joint sealant. <br />3. For insulation with factory-applied jackets on above-ambient surfaces, secure laps with <br /> outward clinched staples at 6 inches <br />4. For insulation with factory-applied jackets on below-ambient surfaces, do not staple <br /> o.c. <br /> longitudinal tabs. Instead, secure tabs with additional adhesive as recommended by insulation <br /> material manufacturer and seal with vapor-barrier mastic and flashing sealant. <br /> <br />B. Insulation Installation on Pipe Flanges: <br />1. Install preformed pipe insulation to outer diameter of pipe flange. <br />2. Make width of insulation section same as overall width of flange and bolts, plus twice the <br /> thickness of pipe insulation. <br />3. Fill voids between inner circumference of flange insulation and outer circumference of <br /> adjacent straight pipe segments with mineral-fiber blanket insulation. <br />4. Install jacket material with manufacturer's recommended adhesive, overlap seams at least 1 <br /> inch <br /> <br />, and seal joints with flashing sealant. <br />C. Insulation Installation on Pipe Fittings and Elbows: <br />1. Install preformed sections of same material as straight segments of pipe insulation when <br /> available. <br />2. When preformed insulation elbows and fittings are not available, install mitered sections of <br /> pipe insulation, to a thickness equal to adjoining pipe insulation. Secure insulation materials <br /> with wire or bands. <br /> <br />D. Insulation Installation on Valves and Pipe Specialties: <br />1. Install preformed sections of same material as straight segments of pipe insulation when <br /> available. <br />2. When preformed sections are not available, install mitered sections of pipe insulation to valve <br /> body. <br />3. Arrange insulation to permit access to packing and to allow valve operation without <br /> disturbing insulation. <br />4. Install insulation to flanges as specified for flange insulation application. <br /> <br />3.08 <br /> <br />INSTALLATION OF POLYOLEFIN INSULATION: <br />A. Insulation Installation on Straight Pipes and Tubes: <br />1. Seal split-tube longitudinal seams and end joints with manufacturer's recommended adhesive <br /> o eliminate openings in insulation that allow passage of air to surface being insulated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.