My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment A - 2015-3-13_Samson Park Technical Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Attachment A - 2015-3-13_Samson Park Technical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 10:00:19 AM
Creation date
11/12/2015 9:46:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMSON OCEANFRONT PARK <br />CITY OF SUNNY ISLES <br />TECHNICAL SPECIFICATIONS <br />LIGHTING CONTROL DEVICES 16145 - 6 <br />A. Schedule visual and mechanical inspections and electrical tests with at least seven days' <br /> advance notice. <br />B. Inspect control components for defects and physical damage, testing laboratory labeling, <br /> and nameplate compliance with the Contract Documents. <br />C. Check tightness of electrical connections with torque wrench calibrated within previous <br /> six months. Use manufacturer's recommended torque values. <br />D. Verify settings of photoelectric devices with photometer calibrated within previous six <br /> months. <br /> <br />E. Electrical Tests: Use particular caution when testing devices containing solid-state com <br /> ponents. Perform the following according to manufacturer's written instructions: <br />1. Continuity tests of circuits. <br />2. Operational Tests: Set and operate devices to demonstrate their functions and capa <br /> bilities in a methodical sequence that cues and reproduces actual operating functions. <br />a. Include testing of devices under conditions that simulate actual operational condi- <br />tions. Record control settings, operations, cues, and functional observations. <br />F. Correct deficiencies, make necessary adjustments, and retest. Verify that specified re <br /> quirements are met. <br />G. Test Labeling: After satisfactory completion of tests and inspections, apply a label to <br /> tested components indicating test results, date, and responsible agency and representative. <br />H. Reports: Written reports of tests and observations. Record defective materials and <br /> workmanship and unsatisfactory test results. Record repairs and adjustments. <br />3.5 <br />A. Cleaning: Clean equipment and devices internally and externally using methods and ma <br /> terials recommended by manufacturers, and repair damaged finishes. <br />CLEANING <br />3.6 <br />A. Coordinate with training for low-voltage, programmable lighting control system specified <br /> in Division 13 Section "Lighting Controls." <br />DEMONSTRATION <br />B. Engage a factory-authorized service representative to train Owner's maintenance person <br /> nel as specified below: <br />1. Train Owner's maintenance personnel on troubleshooting, servicing, adjusting, and <br /> preventive maintenance. Provide a minimum of three hours' training. <br />2. Training Aid: Use the approved final version of maintenance manuals as a training <br /> aid. <br />3. Schedule training with Owner, through Architect, with at least seven days' advance <br /> notice.
The URL can be used to link to this page
Your browser does not support the video tag.