My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hypower, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Responses
>
Hypower, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 4:18:25 PM
Creation date
1/7/2016 3:39:47 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Collins Ave. Utility Undergrounding
Bid No. (xx-xx-xx)
15-12-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PER ITEM <br /> PER 01020 Quantity Unit Unit Costs Base Price <br /> Supply and install only two (2 )-4 inch PVC <br /> 34 schedule 40 conduit bundled in one main 2,524 LF 83.77 $211,435.48 <br /> trench with others for Atlantic Broadband <br /> Supply and install only three(3)-4 inch PVC <br /> 35 schedule 40 conduit bundled in one main 4,532 LF 93.45 $423,515.40 <br /> trench with others for Atlantic Broadband <br /> Supply and install only five(5)-4 inch PVC <br /> 36 schedule 40 conduit bundled in one main 1,181 LF 124.36 $146,869.16 <br /> trench with others for Atlantic Broadband <br /> Supply and install only six(6)-4 inch PVC <br /> 37 schedule 40 conduit bundled in one main 4,573 LF 144.86 $662,444.78 <br /> trench with others for Atlantic Broadband <br /> Supply and install nine (9)-4 inch PVC <br /> 38 schedule 40 conduit bundled in one main 111 LF 206.68 $22,941.48 <br /> trench with others for Atlantic Broadband <br /> Supply and Install three (3)-4inch PVC <br /> schedule 40 lateral conduit bundled in one 122.52 $124,112.76 <br /> 39 lateral trench with others for Atlantic 1013 LF <br /> Broadband <br /> Supply and Install four(4)-4inch PVC schedule <br /> 40 40 lateral conduit bundled in one lateral trench 397 LF 167.54 $66,513.38 <br /> with others for Atlantic Broadband <br /> — <br /> Supply and Install five (5)-4inch PVC schedule <br /> 41 40 lateral conduit bundled in one lateral trench 36 LF 202.87 $7,303.32 <br /> with others for Atlantic Broadband <br /> Supply and Install six(6)-4inch PVC schedule <br /> 42 40 lateral conduit bundled in one lateral trench 2,290 LF 163.23 $373,796.70 <br /> with others for Atlantic Broadband <br /> Supply and Install seven (7)-4inch PVC <br /> schedule 40 lateral conduit bundled in one43 225.24 $9,460.08 <br /> lateral trench with others for Atlantic 42 LF <br /> Broadband <br /> Supply and Install eight (8)-4inch PVC <br /> schedule 40 lateral conduit bundled in one 256.32 $59,209.92 <br /> 44 <br /> lateral trench with others for Atlantic 231 LF <br /> Broadband <br /> Supply and Install nine (9)-4inch PVC schedule <br /> 45 40 lateral conduit bundled in one lateral trench 528 LF 249.17 $131,561.76 <br /> with others for Atlantic Broadband <br /> Supply and install twelve(12)-4 inch PVC <br /> 46 schedule 40 lateral conduit in one lateral 38 LF 280.79 $10.670.02 <br /> trench for Atlantic Broadband <br /> Supply and install two (2)4 inch PVC schedule <br /> 47 40 lateral conduit in one lateral trench 65 LF 305.11 $19,832.15 <br /> exclusive for Atlantic Broadband <br /> Supply and install three (3)4 inch PVC <br /> 48 schedule 40 lateral conduit in one lateral 163 LF 236.22 $38,503.86 <br /> trench exclusive for Atlantic Broadband <br /> Supply and install six(6)4 inch PVC schedule <br /> 49 40 lateral conduit in one lateraftrench 99 LF 378.84 $37,505.16 <br /> exclusive for Atlantic Broadband <br /> 00300-5/26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.