My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hypower, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Responses
>
Hypower, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 4:18:25 PM
Creation date
1/7/2016 3:39:47 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Collins Ave. Utility Undergrounding
Bid No. (xx-xx-xx)
15-12-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PER ITEM <br /> PER 01020 Quantity Unit Unit Costs Base Price <br /> 50 <br /> Supply and install 30"x 48"x36" handhole for 73 EA 2,315 $168,995.00 <br /> Atlantic Broadband <br /> Supply and install two (2 )-4 inch PVC schedule <br /> 51 40 conduit bundled in one main trench with 1,154 LF 85.41 $98,563.14 <br /> others for AT&T <br /> Supply and Install two(2)-4inch PVC schedule <br /> 52 40 lateral conduit bundled in one lateral trench 198 LF 189.33 $37,487.34 <br /> with others for AT&T <br /> Supply and install one (1)-4 inch PVC schedule <br /> 53 40 lateral conduit in one lateral trench 142 LF 216.22 $30,703.24 <br /> exclusive for AT&T <br /> Supply and install two(2)4 inch PVC schedule <br /> 54 40 lateral conduit in one lateral trench 99 LF 270.79 $26,e08.21 <br /> exclusive for AT&T <br /> 55 Supply and install 30"x 48"x36" handhole for 9 EP, 2,593.00 $23,337.00 <br /> AT&T <br /> Supply and install two(2 )-4 inch PVC schedule <br /> 56 40 conduit bundled in one main trench with 4,435 LF 83.56 $370,588.60 <br /> others for Comcast _ <br /> Supply and install three(3)-4 inch PVC <br /> 57 schedule 40 conduit bundled in one main 5,381 LF 93.86 $505,060.66 <br /> trench with others for Comcast <br /> Supply and install four(4 )-4inch PVC schedule <br /> 58 40 conduit bundled in one main trench with 322 LF 118.68 $38,214.96 <br /> others for Comcast <br /> Supply and Install two(2)-4inch PVC schedule <br /> 59 40 lateral conduit bundled in one lateral trench 909 LF 103.13 $93,745.17 <br /> with others for Comcast <br /> Supply and Install three (3)-4inch PVC • <br /> 60 schedule 40 lateral conduit bundled in one 316 LF 166.21 $52,522.36 <br /> lateral trench with others for Comcast <br /> Supply and Install four(4)-4inch PVC schedule <br /> 61 40 lateral conduit bundled in one lateral trench 905 LF 142.00 $128,510.00 <br /> with others for Comcast <br /> Supply and Install five (5)-4inch PVC schedule <br /> 62 40 lateral conduit bundled in one lateral trench 39 LE 662.61 $25,841.79 <br /> with other for Comcast <br /> Supply and Install six(6)-4inch PVC schedule <br /> 63 40 lateral conduit bundled in one lateral trench 631 LF 184.61 $116,488.91 <br /> with other for Comcast <br /> Supply and Install eight(8)-4inch PVC <br /> 64 schedule 40 lateral conduit bundled in one 62 LF 305.00 $18,910.00 <br /> lateral trench with other for Comcast <br /> Supply and install two (2)4 inch PVC schedule <br /> 65 40 lateral conduit in one lateral trench 54 LF 285.00 $15,390.00 <br /> exclusive for Comcast <br /> Supply and install six(6)4 inch PVC schedule <br /> 66 40 lateral conduit in one lateral trench 103 LF 285.00 $29,355.00 <br /> exclusive for Comcast <br /> 67 Supply and install 24"x 48"x36" handhole for 2,294.00 $123,876.00 <br /> Comcast <br /> 00300-6/26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.