My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hypower, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Responses
>
Hypower, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 4:18:25 PM
Creation date
1/7/2016 3:39:47 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Collins Ave. Utility Undergrounding
Bid No. (xx-xx-xx)
15-12-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AY <br /> ITEM <br /> PER 0102 Quantity Unit Unit Costs Base Price <br /> PER 01020 <br /> Supply and install two(2 )-2 inch PVC schedule <br /> 68 40 conduit bundled in one main trench with 78 LF 160.10 $12,487.80 <br /> others for Hotwire <br /> Supply and Install two(2)-2 inch PVC schedule <br /> 69 40 lateral conduit bundled in one lateral trench 344 LF 169.81 $58,414.64 <br /> with other for Hotwire <br /> Supply and install two(2)-2 inch PVC schedule <br /> 70 40 lateral conduit in one lateral trench 33 LF 303.00 $9,999.00 <br /> exclusive for Hotwire <br /> Supply and install directionally bored two(2)- <br /> 71 2" HDPE for Hotwire including profile 5,287 LF 43.89 $232,046.43 <br /> construction drawings <br /> 72 Supply and install 24"x 36"x18" handhole for 11 EA 2,115.00 $23,265.00 <br /> Hotwire <br /> 73 Supply and install 30"x 48"x24" handhole for 1 EA 3,163.00 $3,163.00 <br /> Hotwire <br /> Supply and install one (1)-2 inch PVC schedule <br /> 74 40 conduit bundled in one main trench with 9,003 LF 20.83 $187,532.49 <br /> others for Street Lighting <br /> Supply and install two(2)-2 inch PVC schedule <br /> 75 40 conduit bundled in one main trench with 98 LF 69.67 $6,827.66 <br /> others for Street Lighting <br /> Supply and Install one (1)-2 inch PVC schedule <br /> 76 <br /> 40 lateral conduit bundled in one lateral trench 115 LF 182.35 s20,970.25 <br /> with other for Street Lighting <br /> Supply and Install two (2)-2 inch PVC schedule <br /> 77 40 lateral conduit bundled in one lateral trench 706 LF 53.23 $37,580.38 <br /> with other for Street Lighting <br /> Supply and Install three (3)-2 inch PVC <br /> 78 schedule 40 lateral conduit bundled in one 54 LF 434.11 $23,441.94 <br /> lateral trench with others for Street Lighting _ <br /> Supply and install one (1)-2 inch PVC schedule <br /> 79 40 lateral conduit in one lateral trench 581 LF 54.42 $31,618.02 <br /> exclusive for Street Lighting <br /> Supply and install two (2)-2 inch PVC schedule <br /> 80 40 lateral conduit in one lateral trench 1,113 LF 44.87 $49,940.31 <br /> exclusive for Street Lighting <br /> Supply and install one (1)-2 inch PVC schedule <br /> 81 40 conduit in a separate trench exclusive for 13,569 LF 20.41 $276,943.29 <br /> Street Lighting <br /> 82 Supply and install 271/2"X18"X12"pull box for 154 EA 366.04 $56,370.16 <br /> Street Lighting_ <br /> Supply and install 30"diameter concrete <br /> 83 foundation for Street Lighting as per sheet L- 111 EA 1,168.00 $129,648.00 <br /> 30 of FDOT Lighting Plans <br /> Supply and install concrete spread footer <br /> 84 foundation for Street Lighting as per sheet L- 3 EA 7,505.00 22,515.00 <br /> 31 of FDOT Lighting Plans <br /> Supply and install four(4)-2 inch PVC schedule <br /> 85 40 conduit bundled in one main trench with 13,069 LF 36.39 $475,580.91 <br /> others for City conduit <br /> 00300-7/26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.