My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-1113 Special City Commission Meeting
SIBFL
>
City Clerk
>
City Commission Minutes
>
2015
>
2015-1113 Special City Commission Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 4:02:25 PM
Creation date
1/7/2016 4:02:23 PM
Metadata
Fields
Template:
CityClerk-City Commission
Meeting Type
Regular
Date (mm/dd/yyyy)
11/13/2015
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summary Minutes:Special City Commission Meeting November 13,2015 City of Sunny Isles Beach,Florida <br /> territory. Ms. Cutt said working with the Army Corps of Engineers is pretty eye opening. <br /> Mayor Scholl said what he thinks we are hearing is that it is the squeaky wheel syndrome. If <br /> we want to do something,you know you can always sit back and leave our fate in the hands <br /> of the County and the State and eventually, hopefully they are going to get to us. He knows <br /> for a fact, under the current Dade County Federal Project that is in place, we were third on <br /> the list from a hot spot perspective, and so the $10 Million that we kind of goaded the <br /> County into, it was the Mayor's Beach Alliance, the County wasn't moving and then when <br /> we had the press conference then all of a sudden all of our phones rang. For the$10 Million <br /> the County is going to put up, but they are going to get some matching funds, is really <br /> probably only going to cover the coming year for the City of Miami Beach because they had <br /> the two (2) worst hot spots, we were third. He thinks we will get treated kind of picky lee <br /> eventually at some level,or the question is,do we spend the money to build the data to create <br /> a position of advocacy, that is what Penny is saying. She is saying that we don't expect you <br /> to be able to afford to go out and form your own beach renourishment or maybe even afford <br /> these mitigation techniques, in some cases we might be able to afford them. But at the very <br /> least, we should probably do the data which is also going to cost hundreds of thousands of <br /> dollars if not millions but you should build the data in order to create a position of advocacy <br /> in order to go out and prove that you do need these things or that these things would be <br /> effective and that ultimately then it comes down to who pays. If you can prove it to be <br /> effective and it may mitigate the State and the Federal government's requirement to renourish <br /> our beaches in the future, they may kick in earlier if we kick in as well. What we have to <br /> contemplate as a Commission is how much do we want to spend on this, do we really see <br /> that there is a little bit of light at the end of the tunnel or not. It is hard to say. <br /> Mayor Scholl said one thing that he does feel very comfortable with, he feels that we have <br /> the right experts. He can tell you that they opened his eyes up to really what happens here. <br /> The truth is, this is science and engineering, and coastal engineering, and even that isn't a <br /> perfect science because there are so many contributing factors, that to model it, it is <br /> complicated. It is a conflict modeling exercise. It is hard to say that in 2012 when the Pier <br /> was done, that the old Pier didn't contribute to slowing down that sand. When the Pier was <br /> done and that project started to trail off, the sand from the north started to trail off in 2013- <br /> 2014 and all of a sudden that little black dotted line is 2015 and it is back. It is hard to say <br /> but the one thing we do know, based on the science, if we had some impediments under the <br /> Pier that created a greater sense of natural ability and slowed things down. What it is doing <br /> is the sand is moving and it hits the wall so to speak even if it is not a solid wall,and then the <br /> sand falls out of suspension and drops, and then you start to build the sand up there but the <br /> trick is that you can't do that and completely gut the south end of the Pier, and that is where <br /> engineering comes in and there is a balancing act there. Or do we put these little walls of <br /> rocks offshore where the sand builds up against those and then creates that effect, and so <br /> there are a lot of things we can do. Those types of projects we can probably afford,again,the <br /> permitting is one of those Federal exams we go through in order to get something done. It is <br /> terrible permitting but you can permit it. The good news is that if we found something that <br /> we want to do, the permitting process is so onerous we can be going after the money while <br /> we are going after the permitting. We can start the permitting process and start lobbying our <br /> co-payers because remember, it is not our beach, it is a County beach. And the fact is, as <br /> many people come from Hollywood, or from West Dade to use that beach especially <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.