Laserfiche WebLink
Monday, December 28, 2015 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Addendum No. 3 <br /> <br />CITY OF SUNNY ISLES BEACH <br />Collins Avenue Utility Undergrounding <br />CITY BID NO. 15-12-03 <br /> <br />To All Bidders: <br /> <br />Bidders for the above-referenced project shall take note of the following changes, additions, deletions, <br />clarifications, etc. to the Plans and Specifications, which in accordance with the Contract Documents <br />shall become a part of and have precedence over anything shown or described otherwise. <br /> <br /> <br /> A pre-bid meeting for this project was held on December 9th, 2015. The meeting minutes and <br />attendance list have been uploaded to Demandstar separately. The following are formal <br />responses to questions asked at the Pre-bid meeting: <br /> <br /> In the Plans that have been uploaded, there are some pavement markings and lighting <br />plans. In the bid items there is nothing about that scope of work. Is that just a reference? <br /> <br />Yes, the FDOT plans that are included in the plan set are for reference. The lighting plans <br />are included to provide design support for the light pole bases, empty electrical conduit and <br />pull boxes which are to be installed under this contract. Pavement marking plans are <br />provided for reference when restoring the existing pavement markings only. <br /> <br /> The MOT Plans that were provided, there were certain sections that were being installed <br />behind the concrete barrier wall, is that correct? <br /> <br />Please refer to FDOT index No. 600, sheet 9 of 12, Drop-Off Condition Note #8 which <br />states “For conditions 1 and 3 provided in Table 1, any drop-off condition that is created and <br />restored within the same work period will not be subject to the use of barriers; h owever, <br />warning devices will be required.” <br /> <br /> Soils report? <br /> <br />A soils report is not available. Please refer to the InfraMap Test Hole Inventory and Report <br />dated December 1st, 2014 (included in Addendum No. 4) for basic soil conditions and water <br />levels. <br /> <br /> <br />