Monday, December 28, 2015 <br /> What is water depth? <br /> <br />Please refer to the InfraMap Test Hole Inventory and Report dated December 1st, 2014 <br />(included in Addendum No. 4) for basic soil conditions and water levels. Water levels will <br />vary according to the season and tides. <br /> <br /> What is the Engineer estimate? <br /> <br />An engineer’s estimate is not available. <br /> <br /> Is there a requirement for pull string when you install the conduit? <br /> <br />Yes, that information is in the bid documents, Section 15060 Conduit and Fittings , Part <br />3.02.A.7 <br /> <br /> FPL Qualifications, etc.? <br /> <br />Contractor will need to provide a letter from the local FPL yard indicating that they have <br />performed work for FPL in the past. In lieu of this letter the contractor must be able to show <br />experience including representative examples in which they have installed underground <br />conduit similar to that in FPL type projects. <br /> <br /> Will FPL provide the conduits? <br /> <br />FPL will supply all material necessary to complete their portion of this project. All other <br />conduit, pull boxes, light pole foundation components, etc. will be the responsibility of the <br />contractor. <br /> <br /> Is FPL in line with the schedule? <br /> <br />Yes, FPL is on board with the schedule. <br /> <br /> The night work, is it five (5) nights a week? <br /> <br />The work will occur on non-peak hours indicated on the Traffic Control Plans sheet C-156, <br />Project Note No. 3. Five (5) nights per week, Sunday through Thursday. <br /> <br /> Is the Geotechnical Report on line? <br /> <br />No Geotechnical report was performed. Please refer to the InfraMap Test Hole inventory <br />and Report dated December 1st, 2014 (included in Addendum No. 4) for basic soil <br />conditions and water levels. <br /> <br /> Can you clarify the bid bond deposit? <br /> <br />The bid bond deposit shall be equal to 5% of the total bid amount. <br /> <br />