Laserfiche WebLink
Monday, December 28, 2015 <br /> What is the scope of work for the Atlantic (Off -Collins) corridor? <br /> <br />The limits of the Atlantic (Off-Collins) work are shown in Exhibit No. 1 (Exhibit No.1 has <br />been made part of Addendum No. 4). The scope of work is similar to that of the work on <br />Collins Ave. This work will be negotiated with the successful bidder. <br /> <br /> Location of the staging area? <br /> <br />The location of the staging area has been identified in Exhibit No. 2 (Exhibit No.2 has been <br />made part of Addendum No. 4). <br /> <br /> <br /> <br />END OF SECTION