Laserfiche WebLink
Monday, December 28, 2015 <br /> SECTION 00801 – LOCAL REQUIREMENTS <br /> <br />Part 1 – General, Paragraph E. Time is of the Essence for this Contract: <br /> <br />DELETE a portion of the first sentence “as set forth elsewhere in this contract.” <br />REPLACE with “in the amount of $2,000 per day every day the Contractor finishes after <br />the completion date. In addition the re will be an incentive of $2,000 per day for every <br />day the Contractor finishes prior to the completion date up to a maximum of 30 days.” <br /> <br /> SECTION 01010 – SUMMARY OF WORK <br /> <br />Part 1 – General, Subsection 1.02 Project Description, Paragraph A: <br /> <br />DELETE the last two sentences of this paragraph: “The project involves work on Collins <br />Avenue from NE 196th Street to Bayview Drive work off Collins Avenue including <br />191,185,178 and 175 Streets from Atlantic Boulevard to Collins Avenue; Atlantic <br />Boulevard from 185 Street to 191 Street and 175 Street to 183 Street and the ea sement <br />north of 175 street and south of 172 Street. All Work must be completed by March 31, <br />2017” <br />REPLACE with “The project involves work on Collins Avenue from NE 196th Street to <br />Haulover Beach County Park. All Work must be completed by March 1, 2017” <br /> <br /> SECTION 01020 – MEASUREMENT AND PAYMENT <br /> <br />Part 1 – General, Subsection 1.05 BASIS FOR PAYMENTS, Paragraph A; Bid <br />Item/Unit: <br /> <br /> Item 27: <br /> <br />DELETE item name: “Install capacitor bank concrete pad” <br />REPLACE with “Install concrete pad for vista switch cabinets”. <br /> <br /> Item 94: <br /> <br />DELETE this item description in its entirety <br />REPLACE with: <br /> <br />Milling of existing asphalt pavement (2 ½” average depth) / SY: This item <br />shall cover the costs for all labor, materials, equipment needed to mill the existing <br />asphaltic pavement outside FDOT project limits meeting the requirements in <br />specification Section 02574. <br /> <br />Measurement for payment shall be based on square yard of milling performed. <br /> <br /> <br /> <br /> <br /> <br />