My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 4
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Addendums
>
Add No 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:03:22 PM
Creation date
1/25/2016 3:59:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monday, December 28, 2015 <br /> Item 95: <br /> <br />ADD this item as follows: <br /> <br />Superpave Asphaltic Conc, Traffic C (1 ½”) / TN: This item shall cover the <br />costs for all labor, materials, equipment needed to place asphaltic pavement <br />outside FDOT project limits meeting the requirements in specification Section <br />02513. <br /> <br />Measurement for payment shall be based on the amount of tons delivered and <br />placed. <br /> <br /> Item 96: <br /> <br />ADD this item as follows: <br /> <br />Asphalt Concrete Friction Course, Traffic C, FC-9.5 (1”) / TN: This item shall <br />cover the costs for all labor, materials, equipment needed to place asphaltic <br />pavement outside FDOT project limits meeting the requirements in specification <br />Section 02513. <br /> <br />Measurement for payment shall be based on the amount of tons delivered and <br />placed. <br /> <br /> SECTION 01570 – TRAFFIC CONTROL (MAINTENANCE OF TRAFFIC) <br /> <br /> Part 1 – General, Subsection 1.10 DESCRIPTION, Paragraph C: <br /> <br />ADD paragraph C as follows: <br /> <br />C. The CONTRACTOR shall maintain traffic control measures during the hours <br />operation indicated on the Traffic Control Plans, sheet C-156, Project Notes # 3. <br /> <br /> SECTION 15060 – CONDUIT AND FITTINGS <br /> <br /> Part 2 – PRODUCTS, Subsection 2.01 DUCTS, All Paragraphs: <br /> <br />DELETE references to schedule 80 PVC conduit <br />REPLACE with schedule 40 PVC conduit. <br /> <br /> Part 2 – PRODUCTS, Subsection 2.01 DUCTS, Paragraph D: <br /> <br />ADD paragraph D as follows: <br /> <br />D. All conduit shall be color coded. Contractor must submit for approval proposed <br />color coding system prior to ordering the material. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.