Laserfiche WebLink
Monday, December 28, 2015 <br /> Item 95: <br /> <br />ADD this item as follows: <br /> <br />Superpave Asphaltic Conc, Traffic C (1 ½”) / TN: This item shall cover the <br />costs for all labor, materials, equipment needed to place asphaltic pavement <br />outside FDOT project limits meeting the requirements in specification Section <br />02513. <br /> <br />Measurement for payment shall be based on the amount of tons delivered and <br />placed. <br /> <br /> Item 96: <br /> <br />ADD this item as follows: <br /> <br />Asphalt Concrete Friction Course, Traffic C, FC-9.5 (1”) / TN: This item shall <br />cover the costs for all labor, materials, equipment needed to place asphaltic <br />pavement outside FDOT project limits meeting the requirements in specification <br />Section 02513. <br /> <br />Measurement for payment shall be based on the amount of tons delivered and <br />placed. <br /> <br /> SECTION 01570 – TRAFFIC CONTROL (MAINTENANCE OF TRAFFIC) <br /> <br /> Part 1 – General, Subsection 1.10 DESCRIPTION, Paragraph C: <br /> <br />ADD paragraph C as follows: <br /> <br />C. The CONTRACTOR shall maintain traffic control measures during the hours <br />operation indicated on the Traffic Control Plans, sheet C-156, Project Notes # 3. <br /> <br /> SECTION 15060 – CONDUIT AND FITTINGS <br /> <br /> Part 2 – PRODUCTS, Subsection 2.01 DUCTS, All Paragraphs: <br /> <br />DELETE references to schedule 80 PVC conduit <br />REPLACE with schedule 40 PVC conduit. <br /> <br /> Part 2 – PRODUCTS, Subsection 2.01 DUCTS, Paragraph D: <br /> <br />ADD paragraph D as follows: <br /> <br />D. All conduit shall be color coded. Contractor must submit for approval proposed <br />color coding system prior to ordering the material. <br /> <br />