My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 00800 - Supplementary General Conditions
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 00800 - Supplementary General Conditions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:55:18 PM
Creation date
1/25/2016 4:55:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />00800 - 3/13 <br /> <br /> <br />B. In case the CONTRACTOR falls behind schedule or where the nature of the Work <br />requires special attention, the CONTRACTOR may be permitted to work additional shifts <br />or to work beyond normal working hours, provided the CONTRACTOR has requested an <br />approval for change of its Work schedule, in writing, from the ENGINEER. In any event, <br />the cost for working additional shifts or beyond normal working hours, unless such Work <br />is required by a change order action or in emergency, shall be borne solely by the <br />CONTRACTOR without any additional cost to the OWNER, including the cost of <br />Resident Project Representative's services. If authorized, the CONTRACTOR shall <br />provide written notice to residences that may be impacted by the work. <br /> <br />D. None but skilled foremen and workmen shall be employed on work requiring special <br />qualifications. Except as otherwise required by law, convicted felons who have not <br />completed their sentences or other workers from county, state or federal prisons who are <br />on work release programs shall not be employed for work on this project. <br /> <br />SGC-6.5 SUBCONTRACT LIMITATIONS <br /> <br />A. In addition to the provisions of Paragraph 6.5 of the General Conditions, the <br />CONTRACTOR shall perform not less than twenty (20) percent of the Work with its own <br />forces (i.e., without subcontracting). The twenty (20) percent requirement shall be <br />understood to refer to the Work, the value of which totals not less than twenty (20) <br />percent of the Contract Price. <br /> <br />B. The apparent low bidder, and such bidders as the OWNER may request in writing, shall <br />submit to the OWNER a list of all subcontractors and other persons and organizations <br />(including those who are to furnish the principal items of materials and equipment) <br />proposed for any portion of this Project. When this list is approved, no deviations shall <br />be allowed from that list without the written consent of the ENGINEER. <br /> <br />ARTICLE 6 - CONTRACTORS RESPONSIBILITIES <br /> <br />Add the following subarticles to the General Conditions: <br /> <br />SGC-6.11 SHOP DRAWINGS AND SAMPLES <br /> <br />Add the following paragraphs to Article 6.11 of the General Conditions: <br /> <br />A. CONTRACTOR shall submit Shop Drawings as required by the Technical Specifications. <br />The purpose of the Shop Drawings is to show the suitability, efficiency, technique of <br />manufacture, installation requirements, details of the item and evidence of its <br />compliance or noncompliance with the Contract Documents. <br /> <br />B. Within thirty (30) calendar days after the Project Initiation Date specified in the Notice to <br />Proceed, CONTRACTOR shall submit to ENGINEER a complete list of preliminary data <br />on items for which Shop Drawings are to be submitted and shall identify the critical <br />items. Approval of this list by ENGINEER shall in no way relieve CONTRACTOR from <br />submitting complete Shop Drawings and providing materials, equipment, etc., fully in