My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 00800 - Supplementary General Conditions
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 00800 - Supplementary General Conditions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:55:18 PM
Creation date
1/25/2016 4:55:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />00800 - 4/13 <br /> <br /> <br />accordance with the Contract Documents. This procedure is required in order to <br />expedite final approval of Shop Drawings. <br /> <br />C. After the approval of the list of items required in Paragraph B above, CONTRACTOR <br />shall promptly request Shop Drawings from the various manufacturers, fabricators, and <br />suppliers. CONTRACTOR shall include all shop drawings and other submittals in its <br />certification. <br /> <br />D. CONTRACTOR shall thoroughly review and check the Shop Drawings and each and <br />every copy shall show this approval thereon. <br /> <br />E. If the Shop Drawings show or indicate departures from the Contract requirements, <br />CONTRACTOR shall make specific mention thereof in its letter of transmittal. Failure to <br />point out such departures shall not relieve CONTRACTOR from its responsibility to <br />comply with the Contract Documents. <br /> <br />F. ENGINEER shall review and approve Shop Drawings within fifteen (15) calendar days <br />from the date received, unless said Drawings are rejected by ENGINEER for material <br />reasons. ENGINEER's approval of Shop Drawings will be general and shall not relieve <br />CONTRACTOR of responsibility for the accuracy of such Drawings, nor for the proper <br />fitting and construction of the work, nor for the furnishing of materials or work required by <br />the Contract Documents and not indicated on the Drawings. No work called for by Shop <br />Drawings shall be performed until the said Drawings have been approved by <br />ENGINEER. Approval shall not relieve CONTRACTOR from responsibility for errors or <br />omissions of any sort on the Shop Drawings. <br /> <br />G. No approval will be given to partial submittals of Shop Drawings for items which <br />interconnect and/or are interdependent where necessary to properly evaluate the <br />design. It is CONTRACTOR's responsibility to assemble the Shop Drawings for all such <br />interconnecting and/or interdependent items, check them and then make one submittal <br />to ENGINEER along with its comments as to compliance, noncompliance, or features <br />requiring special attention. <br /> <br />H. If catalog sheets or prints of manufacturers' standard drawings are submitted as Shop <br />Drawings, any additional information or changes on such drawings shall be typewritten <br />or lettered in ink. <br /> <br />I. CONTRACTOR shall submit the number of copies required by ENGINEER. <br />Resubmissions of Shop Drawings shall be made in the same quantity until final approval <br />is obtained. <br /> <br />J. CONTRACTOR shall keep one set of Shop Drawings marked with ENGINEER's <br />approval at the job site at all times. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.