My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 01200- Project Meetings and Reports
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 01200- Project Meetings and Reports
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:55:59 PM
Creation date
1/25/2016 4:55:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />01200 - 2/3 <br />i. Office, work and storage areas. <br />ii. City's requirements. <br />i. Construction facilities, controls, and construction aids. <br />j. Temporary utilities. <br />k. Safety and first aid. <br />l. Security. <br />m. Requirements of any permits obtained by the City. <br /> <br />4. Location of Meeting: To be determined. <br /> <br />B. Progress Meetings: <br />1. Engineer will administer a meeting bi-weekly. Contractor and Engineer shall <br />be represented at each meeting. Contractor may request attendance by <br />representatives of his Suppliers and other Subcontractors, or other entities <br />concerned with current program or involved with planning, coordination or <br />performance of future activities. All participants in the meeting shall be familiar <br />with the Project and authorized to conclude matters relating to the Work. <br /> <br />2. Contractor and each Subcontractor shall be prepared to discuss the current <br />construction progress report, any anticipated future changes to the schedule, <br />and advise if their current progress or future anticipated schedules are <br />compatible with the Work. <br /> <br />3. Agenda. <br />a. Review of construction progress since previous meeting. <br />b. Field observations, interface requirements, conflicts. <br />c. Problems which impede construction schedule. <br />d. Off-site fabrication. <br />e. Delivery schedules. <br />f. Submittal schedules and status. <br />g. Site utilization. <br />h. Temporary facilities and services. <br />i. Hours of Work. <br />j. Hazards and risks. <br />k. Housekeeping. <br />l. Quality and Work standards. <br />m. Change orders. <br />n. Documentation of information for payment request. <br />o. Corrective measures and procedures to regain projected schedule if <br />necessary. <br />p. Revisions to construction schedule. <br />q. Progress and schedule during succeeding Work period. <br />r. Review proposed changes for:
The URL can be used to link to this page
Your browser does not support the video tag.