My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 01300 Submittals
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 01300 Submittals
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:56:11 PM
Creation date
1/25/2016 4:56:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />01300 - 1/9 <br />SECTION 01300 SUBMITTALS <br />PART 1 - GENERAL <br />1.01 SUMMARY: <br />A. This Section includes definitions, descriptions, transmittal, approval procedures and <br />review of "Compliance" and "Miscellaneous" Submittals. <br />1.02 GENERAL INFORMATION: <br />A. Definitions: <br />1. Compliance Submittals include shop drawings, product data, and samples <br />which are prepared by the Contractor, Subcontractor, manufacturer, or Supplier <br />and submitted by the Contractor to the City as a basis for approval of the use <br />of Equipment and Materials proposed for incorporation in the Work or needed <br />to describe installation, operation, maintenance, or technical properties. <br />a. Shop drawings include custom-prepared data of all types including <br />drawings, diagrams, performance curves, material schedules, templates, <br />instructions, and similar information not in standard printed form <br />applicable to other projects. <br />b. Product data includes standard printed information on materials, products <br />and systems; not custom-prepared for this Project, other than the <br />designation of selections from available choices. <br />c. Samples include both fabricated and unfabricated physical examples of <br />materials, products, and Work; both as complete units and as smaller <br />portions of units of Work; either for limited visual inspection or (where <br />indicated) for more detailed testing and analysis. Mock-ups are a special <br />form of samples which are too large to be handled in the specified <br />manner for transmittal of sample Submittals. <br />2. Miscellaneous Submittals are those technical reports, administrative <br />Submittals, certificates, and guarantees not defined as shop drawings, product <br />data, or samples. <br />a. Technical reports include laboratory reports, tests, technical procedures, <br />technical records, Contractor's design analysis and Contractor's survey <br />field notes for construction staking, before cross-sections and after cross- <br />sections. <br />b. Administrative Submittals are those nontechnical Submittals required by <br />the Contract Documents or deemed necessary for administrative records. <br />These Submittals include maintenance agreements, workmanship Bonds, <br />Project photographs, physical work records, statements of applicability, <br />copies of industry standards, as-constructed data, <br />security/protection/safety data, and similar type Submittals. <br />c. Certificates and guarantees are those Submittals on Equipment and <br />Materials where a written certificate or guarantee from the manufacturer <br />or Supplier is called for in the Specifications. <br /> <br />d. Reports as required by Contract describing Contractor's means and <br />methods for items such as dewatering, earth and water retaining, <br />erosion/turbidity control, and safety plans.
The URL can be used to link to this page
Your browser does not support the video tag.