My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 01300 Submittals
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 01300 Submittals
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:56:11 PM
Creation date
1/25/2016 4:56:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />01300 - 2/9 <br />3. Refer to ARTICLE 1.03 of this Part for detailed lists of documents and specific <br />requirements. <br />B. Quality Requirements: <br />1. Submittals such as shop drawings and product data shall be of the quality for <br />legibility and reproduction purposes. Every line, character, and letter shall be <br />clearly legible. Drawings such as reproducibles shall be useable for further <br />reproduction to yield legible hard copy. <br />2. Documents submitted to the City that do not conform to these requirements <br />shall be subject to rejection by the City, and upon request by City, Contractor <br />shall resubmit conforming documents. If conforming Submittals cannot be <br />obtained, such documents shall be retraced, redrawn, or photographically <br />restored as may be necessary to meet such requirements. Contractor's (or his <br />Subcontractor's) failure to initially satisfy the legibility quality requirements will <br />not relieve Contractor (or his Subcontractors) from meeting the required <br />schedule for Submittal of shop drawings and product data. <br />C. Language and Dimensions: <br />1. All words and dimensional units shall be in the English language. <br />2. Metric dimensional unit equivalents may be stated in addition to the English <br />units. <br />D. Submittal Completeness: <br />1. Submittals shall be complete with respect to dimensions, design criteria, <br />materials of construction, and other information specified to enable the City to <br />review the information effectively. <br />2. Where standard drawings are furnished which cover a number of variations of <br />the general class of equipment, each such drawing shall be individually <br />annotated to describe exactly which parts of the drawing apply to the <br />equipment being furnished. Use hatch marks to indicate variations that do not <br />apply to the Submittal. The use of "highlighting markers" is not an acceptable <br />means of annotating Submittals. Such annotation shall also include proper <br />identification of the Submittal permanently attached to the drawing. <br />3. Reproduction or copies of Contract Drawings or portions thereof will not be <br />accepted as complete fabrication or erection drawings. The Contractor may <br />use a reproduction of the City- prepared Contract Drawings for erection <br />drawings such as to indicate information on erection or to identify detail <br />drawing references. Where the drawings are revised to show this additional <br />Contractor information, the City's title block shall be replaced with a <br />Contractor's title block and the City's professional seal shall be removed from <br />the drawing. The Contractor shall revise these erection drawings for <br />subsequent City revisions to the Contract Drawings. <br />1.03 COMPLIANCE SUBMITTALS: <br />A. Items shall include, but not be limited to, the following: <br />1. Manufacturer's specifications for materials, pipe and fittings to be used. <br />2. Catalogs, or parts thereof, of manufactured equipment. <br />3. Shop fabrication and erection drawings (Valve Vaults). <br />4. Horizontal Directional Drilling route, plan and procedures.
The URL can be used to link to this page
Your browser does not support the video tag.