<br />01300 - 4/9 <br />C. Transmittal of Compliance Submittals: <br />1. All Compliance Submittals of Equipment and Materials furnished by <br />Subcontractors, Manufacturers, and Suppliers shall be submitted to the City by <br />Contractor. <br />2. After checking and verifying all field measurements, transmit all Compliance <br />Submittals to the City for acceptance as follows: <br />a. Identify each Compliance Submittal by Submittal Number, Project name <br />and number, Contract title and number, and the Specification Section and <br />article number marked thereon or in the letter of transmittal. <br />Unidentifiable Submittals will be returned for proper identification. <br />b. Check and stamp Compliance Submittals of Subcontractors, Suppliers, <br />and Manufacturers with Contractor's approval prior to transmitting them to <br />the City. Contractor's stamp of approval shall constitute a representation <br />to the City that Contractor has either determined and verified all <br />quantities, dimensions, field construction criteria, materials, catalog <br />numbers, and similar data, or he assumes full responsibility for doing so, <br />and that he has coordinated each Compliance Submittal with the <br />requirements of the Work and the Contract Documents. <br />c. At the time of each submission, call to the attention of City in the letter of <br />transmittal any deviations from the requirements of the Contract <br />Documents. <br />d. Make all modifications noted or indicated by City and return revised prints, <br />copies, or samples until accepted. Direct specific attention in writing, or <br />on revised Submittals, to changes other than the modifications called for <br />by the City on previous Submittals. After Submittals have been accepted, <br />submit copies thereof for final distribution. Prints of accepted drawings <br />transmitted for final distribution will not be further reviewed and are not to <br />be revised. If errors are discovered during manufacture or fabrication, <br />correct the Submittal and resubmit for review. <br />e. Following completion of the Work and prior to final payment, furnish those <br />Drawings necessary to indicate "as constructed" conditions, including field <br />modifications, in the number of copies specified. Furnish additional <br />copies for insertion in equipment instruction books as required. All such <br />copies shall be clearly marked "AS CONSTRUCTED." <br />f. Work requiring a Compliance Submittal shall not be commenced or <br />shipped until the Submittal has been stamped "Submittal Accepted" or <br />"Submittal Acceptable as Noted" by the City. <br />g. Keep a copy or sample of each Compliance Submittal in good order at the <br />site. <br />3. Quantity Requirements: <br />a. Except as otherwise specified, transmit all manufacturer's or fabricator's <br />Shop Drawings in the quantity as follows: <br />i. Initial Submittal: Seven copies including one reproducible to City. <br />Two copies will be returned to Contractor. <br />ii. Resubmittals: Seven copies including one reproducible to City. <br />Two copies will be returned to Contractor. <br />iii. Submittal for Final Distribution: Four copies to City.