My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 01300 Submittals
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 01300 Submittals
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:56:11 PM
Creation date
1/25/2016 4:56:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />01300 - 5/9 <br />iv. As-Constructed Prints: Three copies including one reproducible to <br />City. <br />b. Transmit Submittals of product data as follows: <br />i. Initial Submittal: Seven copies to City. Two copies will be returned <br />to Contractor. <br />ii. Resubmittals: Seven copies to City. Two copies will be returned to <br />Contractor. <br />iii. Submittal for Final Distribution: Four copies to City. <br />c. Transmit Submittals of material Samples, color charts, and similar items <br />as follows: <br />i. Initial Submittal: Six to City. <br />ii. Resubmittal: Six to City. <br />iii. Upon approval, one Sample will be returned to Contractor. <br />d. Transmit Submittals of equipment instruction books as follows: <br />i. Initial Submittal: Three copies to City. One copy will be returned to <br />Contractor. <br />ii. Resubmittals: Three copies to City. One copy will be returned to <br />Contractor. <br />iii. Submittal for Final Distribution: Three copies to City. <br />e. Transmit Submittals for Reference Only - Three copies to City. <br />4. Copies of the equipment contractor's erection drawings and other Compliance <br />Submittals required for the installation of equipment furnished by others under <br />separate contract for installation under this Contract will be transmitted to <br />Contractor by the City in the final distribution of such Submittals. <br />D. City's Review: <br />1. The City will review and return Compliance Submittals to Contractor with <br />appropriate notations via City. Instruction books and similar Submittals will be <br />reviewed by the City for general content but not for substance. <br />2. The City's acceptance of Compliance Submittals will not relieve Contractor <br />from his responsibility as stated in the GENERAL CONDITIONS. <br />E. Compliance Submittal Action Stamp: <br />1. The City's review action stamp, appropriately completed, will appear on all <br />Compliance Submittals of Contractor when returned by the City. Review status <br />designations listed on City's action stamp are defined as follows: <br />a. "ACCEPTED AS SUBMITTED": Signifies Equipment or Material <br />represented by the Submittal conforms with the design concept and <br />complies with the intent of the Contract Documents and is acceptable for <br />incorporation in the Work. Contractor is to proceed with fabrication or <br />procurement of the items and with related Work. Copies of the Submittal <br />are to be transmitted to the City for final distribution. <br />b. "ACCEPTED AS NOTED”: Signifies Equipment and Material represented <br />by the Submittal conforms with the design concept and complies with the <br />intent of the Contract Documents and is acceptable for incorporation in <br />the Work subject to the condition that as constructed it shall be in <br />accordance with all notations and/or corrections indicated. Contractor is to
The URL can be used to link to this page
Your browser does not support the video tag.