My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 02100 Site Preparation
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 02100 Site Preparation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:57:34 PM
Creation date
1/25/2016 4:57:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />02100 - 2/2 <br />3.03 EROSION CONTROL: The CONTRACTOR shall prevent and control erosion and water <br />pollution as per FDOT Specification Sections 104-1, 2, 3, 4, 6 and 7 and Florida <br />Department of Environmental Protection (FDEP) regulations and permit conditions. <br />3.04 PROTECTION AND/OR RELOCATION OF EXISTING FACILITIES: Existing facilities <br />such as storm drains, roadways, water lines, light poles, conduits, fences, utility and <br />telephone lines, etc. are to be carefully protected from damage during all phases of the <br />construction. The CONTRACTOR shall make all necessary arrangements with the owner <br />of the facility and be responsible for all costs involved in the proper protection, relocation <br />or other work that such owners deem necessary. See General Specification. <br />3.05 UNDERGROUND UTILITIES: The CONTRACTOR shall provide all necessary liaisons <br />with other utilities (underground) by notification, 48 hours in advance, of any digging by <br />telephoning the appropriate Utility Notification Center and local utilities. <br /> <br />END OF SECTION <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.