My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 02401 Dewatering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 02401 Dewatering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:58:06 PM
Creation date
1/25/2016 4:58:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />02401 - 2/2 <br />1. All dewatering equipment shall be in first-class condition and shall at all times <br />be maintained and operated at the efficiency and capacity necessary for <br />maintaining the excavation free from standing water or wet conditions that <br />prevent proper construction. <br />C. The CONTRACTOR shall provide dewatering facilities with stand-by pumps with 100 <br />percent standby capacity. <br />D. The CONTRACTOR shall comply with all local, state and federal regulations when <br />disposing of water generated by dewatering operations. <br />3.02 REMOVAL OF DEWATERING SYSTEM: <br />A. The CONTRACTOR shall remove the dewatering system in such a manner as to <br />allow groundwater elevations to slowly return to natural elevations. <br />3.03 REGULATION SCHEDULE: <br />A. Noise Abatement: The CONTRACTOR shall furnish, install, and maintain throughout <br />the course of the work, mufflers, noise-control enclosures, or other noise control <br />methods, measures, and features on and around all dewatering pumps and their <br />prime movers such that steady noise emanating from this equipment does not <br />exceed the permissible sound levels defined in the local County ordinances. <br /> <br />END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.