My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Section 02513 Asphaltic Concr Paving
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-12-02) Utility Undergrounding
>
Additional Specs
>
Section 02513 Asphaltic Concr Paving
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 4:58:32 PM
Creation date
1/25/2016 4:58:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />02513 - 2/3 <br />A. Weather Limitations: Application shall be made when the air temperature in the <br />shade is above 40 degrees F. <br />B. Prime Coat: Application of the prime coat shall conform to FDOT Specification <br />Section 300-7. The surface to be primed shall be clean, and moisture content of the <br />base shall not exceed 90% of the optimum. The temperature of the prime material <br />shall be between 100 degrees and 150 degrees F. The material shall be applied by <br />means of a pressure distributor. The rate of application shall be not less than <br />0.10gal/sy, unless directed otherwise by ENGINEER. <br />C. Tack Coat: Application of the tack coat shall conform to FDOT Specification Section <br />300-8. The tack coat shall be applied with a pressure distributor. The material shall <br />be heated to a suitable temperature for proper application. The rate of application <br />shall be between 0.02 and 0.10gal per square yard. The time of application shall be <br />sufficiently in advance of laying of the bituminous surface course to permit drying, but <br />shall not be applied so far in advance so as to lose adhesiveness. The surface shall <br />be kept free from traffic until the subsequent layer of bituminous hot mix has been <br />laid. <br />3.02 LAYING OF ASPHALTIC CONCRETE: The CONTRACTOR shall lay the asphaltic <br />concrete pavement in conformance with the following: <br />A. Limitations of Operations: The laying operations shall not begin unless the weather <br />is suitable for all activities to be completed in dry conditions. <br />B. Preparation: The preparation of the asphalt cement, aggregates and mixture shall <br />conform to FDOT Specification Section 330-4, 5, and 6. <br />C. Transportation: The mixture shall be transported as specified in FDOT Specification <br />Section 330-7. <br />D. Placing Mixture: Placing the mixture shall conform to FDOT Specification Section <br />330-9. Lift thickness shall be 1” thick after compaction or as shown on the drawings. <br />E. Compacting Mixture: Compaction of the asphaltic concrete shall be in accordance <br />with FDOT Specification Section 330-10. <br />F. Surface Requirements: The surface shall conform to FDOT Specification Section <br />330-12. <br />3.03 PROTECTION OF FINISHED SURFACES: The CONTRACTOR shall protect the finished <br />asphaltic concrete pavement surface upon completion. No dumping of any material <br />directly on the pavement shall be permitted. Vehicular traffic shall not be permitted on any <br />pavement that has not set sufficiently to prevent rutting or other distortion. <br />3.04 TEMPORARY PAVEMENT OVER TRENCHES: Temporary pavement over trenches shall <br />be installed according to this section and the Detail Sheets in the Construction Documents. <br />The temporary pavement shall meet the elevations of the existing pavement at the saw- <br />cuts, and shall be uniform in thickness and shall conform to the slope of the original <br />pavement. <br />3.05 FULL LANE WIDTH PAVEMENT OVERLAY: At all affected street lanes, and as indicated <br />on the plans, will receive a full lane width pavement overlay. Connections to existing not <br />resurfaced roads shall be provided with a saw cut and milling to a depth of 1” a 2 foot wide <br />strip at all connections to existing pavement for the full roadway width perpendicular to the
The URL can be used to link to this page
Your browser does not support the video tag.