Laserfiche WebLink
0 <br /> ® Lake Patricia Neighborhood Roadway&Drainage Improvements, Miami Lakes, FL <br /> • This project consists of the implementation of drainage improvements identified on the most recent <br /> y •'' 1";.:: '- _A Town of Miami Lakes Stormwater Master Plan within approximately one <br /> -TeNik(OM <br /> square mile of an existing residential neighborhood near Lake Patricia in <br /> ACL .. .i A_ _ <br /> ® • ,_ �,v- „%;.::•->--ry- ,�= southern Miami Lakes near Ludlam Road. Services include utility <br /> -4444 <br /> ® r • z •;�� _.; coordination, schematic and final design phases, government permitting, <br /> Y -: — • <br /> -LAI bidding assistance, construction administration and statements of work <br /> ® • <br /> !'. completion. The CMA team modeled the existing conditions to derive the <br /> ® r en •• V best value locations for stormwater improvements, while maximizing and <br /> •® improving the current stormwater system. The designs included connecting <br /> ® portions of the existing system and utilizing strategic locations for <br /> exfiltration trench to increase the overall storage capabilities of the <br /> ,_..r neighborhood. <br /> CMA is also assisting Miami Lakes with the acquisition of a Federal <br /> ® J. Emergency Management Agency (FEMA) Hazard Mitigation Grant. This <br /> • :.r.>.. <br /> task entailed rainfall data collection, additional pre-improvement versus <br /> ® post-improvement stormwater analysis using GIS, analysis of potential <br /> ® damages to homes during various rainfall events using Army Corp of Engineers (ACOE) criteria and <br /> ® the comparison of benefits versus cost of the project. These tasks were compiled in a report that was <br /> submitted to FEMA for review. <br /> ® Client <br /> ® Town of Miami Lakes <br /> • Hiram Siaba <br /> 15150 NW 79 Ct, 1st Floor <br /> ® Miami Lakes, FL 33014 <br /> ® <br /> (305) 364-6100 <br /> • Miami-Dade Water and Sewer Department VE Study-60" Force Main, Miami-Dade County,FL <br /> • Chen Moore and Associates was retained by the Miami-Dade Water and Sewer Department to perform <br /> ® a value engineering study for the 60" force main between the South Miami Heights Water Treatment <br /> Plant and South District Wastewater Treatment Plant. This force main is for the disposal of the reject <br /> • water from the membrane water treatment units currently under construction at the water plant. <br /> ® Major cost saving ideas proposed included:Twin 42" directional drilled HDPE pipe under the Turnpike <br /> ® and C-1 Canal instead of the single 60" micro-tunneling DIP crossing; shallowing and open cut across <br /> US-1 instead of deeper micro-tunneling; narrowing the size and reducing the number of isolation <br /> ® plug valves; and modifying the 24" outlets. The VE report also increased the allowance for the trench <br /> • overcut, sheeting,flowable fill, and dewatering. Despite these cost increases, an overall $1.6 million in <br /> ® cost savings were realized. <br /> Client <br /> ® Miami Dade Water and Sewer Department <br /> ® Carlos Benavides <br /> ® 3071 SW 38th Ave., Rm 429-25 <br /> Miami, FL 33146 <br /> • (786) 268-5285 <br /> 0 <br /> • <br /> • AP <br /> S <br /> CH EN MOO RE RFONo.12-04-02 Continuing Professionalalrchitecturols Engineering Services Firms Only(CcNA.1 <br /> . Category:Civil Engineering 2-7 <br /> anssocwns <br />