My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
G. Batista - MEP Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
G. Batista
>
G. Batista - MEP Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 2:26:10 PM
Creation date
2/5/2016 2:13:59 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engin. Svcs
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� &. &' � <br /> I7o <br /> 1 c. Assist the client and contractor with obtaining the Certificate of Occupancy if <br /> applicable. <br /> d. Coordinate with the contractor in order to provide the required as-builts. <br /> e. Provide other assistance to the contractor as may be needed. <br />' BUILD <br /> "Build" is the only process that we have no control over but have included it in the "Method Sphere' <br /> ' as the ultimate last step in the standard progression of the design process. <br /> OVERALL ORGANIZATION TO COMPLETING PROJECTS <br /> ' Greg Batista. PE. CGC. LEED AP. CEM is the engineer that is in responsible charge of all the <br /> designs and projects that he and his company perform whether it's an inspection, a Structural or MEP <br /> design. Our success. even during these hard economic times. has been mostly due to the non- <br /> ' compromising implementation of our afore-mentioned "Method Sphere" tactic for completing our <br /> engineering tasks. <br /> ' The overall organization that is employed to attack a given engineering task revolves around the first <br /> step which is the "Strategy". It is during this initial and critical phase that we assess the scope of <br /> ' work and apply the appropriate resources for its successful <br /> 0 <br /> and timely completion. Through the years. Mr. Batista has <br /> been able to amass a pool of talent that are both full-time <br /> ' v j employees as well as hired consultants. <br /> —• 1 <br /> /� ► i Whatever the project may be. Mr. Batista will always remain <br /> • <br /> • at the main point of contact and will be intimately involved <br /> in all the aspects of the project even if he assigns one of his <br /> 1.,„.."-%, Project Managers to some of the minor tasks. <br /> ' IABILITY TO MEET THE DESIRED TIMELINES AND DEADLINES <br /> We do not know of any company that will employ a losing marketing strategy of advertising their <br /> ' inability to meet deadlines. But as a licensed. successful and seasoned General Contractor. Mr. <br /> Batista knows first-hand the importance of"doing what you say you are going to do'. Even through <br /> ' these hard economic times, Mr. Batista is a continually sought-after professional due to his <br /> unblemished reputation as delivering on his promises. Those that do not. simply wither away in this <br /> A/E/C industry, where those that survive, are professionals that consistently provide cost-effective. <br /> ' timely and quality services. <br /> CITY OF SUNNY ISLES BEACH <br /> RFQ No. 12-04-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.