Laserfiche WebLink
I <br /> I G. <br /> &ASS OCIIATErESS <br /> l8© <br /> IThe ability to meet timelines and deadlines has a direct correlation to the availability of resources to <br /> employ to the given task. Upon embarking on the "Strategy' we assess the amount of resources <br /> I required to successfully complete the task within the time given. The resources include the amount of <br /> personnel. the time allotted to each person for each task. and also the equipment. software, and <br /> materials required. We have an ample office in Cooper City for the past 6 years with all the <br /> Iequipment required to conduct efficient engineering business. Additionally. Mr. Batista's employees <br /> are ready. willing and able to perform and support Mr. Batista in his duties. and our extensive <br /> I network of hired and seasoned consultants are always at hand to supplement our forces when time <br /> constraints require it. <br /> I <br /> ail=aliSeillg <br /> IIndividual Strengths in Particular Projects: <br /> PARKING GARAGES <br /> IGreg Batista has been on both sides of the fence in the construction of parkin, garage structures <br /> handling both the design and the building using various methods such as cast-in-place and the more <br /> Iwidely-used precast methods. There are very few people in the industry that have this level of <br /> experience in knowing the intricacies of successfully designing and building a parking garage <br /> Istructure. <br /> PROJECT: Doral Concourse I Parking Garage <br /> ILOCATION: Doral. Florida <br /> DESCRIPTION: 350.000 square foot pre-cast Parking Garage Structure <br /> ICAPACITY: Greg Batista was the Project Manager in charge of both the designing and <br /> building of this pre-cast parking facility. <br /> ! <br /> moii <br /> ' a - .' <br /> ' CITY OF SUNNY ISLES BEACH <br /> RFQ No. 12.04-02 <br /> I <br />