My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Frank Costoya Architect
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Frank Costoya Architect
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 3:12:05 PM
Creation date
2/10/2016 3:12:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Services
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O <br /> Fast Track Process Frank Costoya Architect, P.A. <br /> O <br /> O The fast track project deliver strategy is a method of implementation where the design and <br /> O construction phases are overlapped to expedite earlier project delivery. <br /> O In the event the City of Sunny Isles Beach identifies a project which for the time frame, economics <br /> Q and/or funds availability period is critical our firm is ready, capable and contains the expertise and <br /> personnel to deliver the fast track approach. <br /> Q Our firm employs the most current technology in software for assisting our professionals on staff <br /> O with fast tracking, scheduling, cost and quality control. <br /> O Important points to consider/evaluate for Fast Track delivery approach: <br /> 0 <br /> O Effective delivery of fast architecture/design consists of three (3) critical elements which are <br /> information, process, and communications. <br /> 0 <br /> O I. Develop Owner program, analyze project type, conditions, constraints and budgetary <br /> ® considerations. <br /> 0 2. Assemble team from the on-set. <br /> O <br /> Q 3. Develop a clear simple organizational chart of key personnel their responsibilities and <br /> specific tasks to be performed from project inception to completion. <br /> 0 <br /> Q 4. Develop a clear/concise/detailed project schedule and identify critical target dates. <br /> O 5. Maintain clear communications at all levels with team members on a daily/weekly basis. <br /> O <br /> • 6. Identify and execute all related services to get the job done. <br /> • Fast Track Advantages <br /> • • Reduced Time <br /> • Lower Cost <br /> • • Reduced Owner Burden <br /> • • Single Source Point of Responsibility <br /> • • Invisible Benefits to Owner by Single Sourcing <br /> • Fast Track Difficulties <br /> • • Government Approval <br /> • • Feedback <br /> • Evaluation of Documents <br /> • • Strict Cash Flow <br /> • Prompt Payments <br /> • Strong, Experienced Owner Project Management Required <br /> • <br /> • <br /> • <br /> • <br /> • <br /> ® .= CITY OF SUNNY ISLES BEACH RFQ NO. 12-04-02 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.