My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Frank Costoya Architect
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-04-02) Professional Architectural and Engineering Services - Firms Only
>
Responses
>
Frank Costoya Architect
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 3:12:05 PM
Creation date
2/10/2016 3:12:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Professional Architectural and Engineering Services
Bid No. (xx-xx-xx)
12-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i) <br /> e4 <br /> P <br /> W, CARRFOUR <br /> supportive lousing <br /> e <br /> el Carrfour Supportive Housing <br /> • 1398 Southwest 1"Street <br /> i <br /> el 121h Floor <br /> • <br /> Miami, Fl 33135 <br /> e <br /> e; Re: Letter of Reference <br /> j <br /> eI To Whom It May Concern: <br /> el This letter shall serve as a reference for Frank Costoya(President), Rene Gibbs(Project Architect)and the firm of <br /> e{ Frank Costoya Architects(FCA). <br /> ®I FCA was awarded the project with one-half of the estimated design schedule duration. They accepted the revised <br /> i schedule and delivered an excellent and timely set of construction documents which yielded a permit in less than <br /> ei ninety days. <br /> The project included the design of rehabilitation project of a Four-Story, 56 unit Apartment Complex including <br /> evaluation and documentation of existing conditions as well as design documents outlining the necessary Green <br /> 0' <br /> Design criteria to obtain Green Communities Certification. <br /> e Prior to commencement, the project experienced significant budget overruns and FCA was an active participant in <br /> mitigating this overrun through and significant Value Engineering(VE)effort with all parties. Once this was process <br /> e' was completed they prepared a marked-up set identifying all VE items, within one week,for all parties to confirm <br /> O the modifications. Once approved by the parties,this set was transformed into a revised permit submission 3 <br /> • weeks later. <br /> 0, Finally,as with all rehabilitations,demolition and uncovering the existing conditions yields unexpected challenges. <br /> e FCA has been ready to facilitate these challenges with timely responses and feasible options with a Teamwork <br /> ® approach. <br /> • It is clear that FCA's performance indicates that they hold the client's interest as a top priority. <br /> e Should you have any questions, please feel free to contact me at 305-371-8300 extension 324. <br /> • <br /> e Respectfu z// <br /> • <br /> e y Rey <br /> ® Director of Construc 'on r.nagement <br /> 0 <br /> e <br /> Cc:File,TR <br /> 0 <br /> e <br /> umliv.r•V I • Strr&•I. I! flnn, isli,ilni flni„Li ;.; <br /> :U'• , •2411111 (ll) iii'i- t I I ye-6 1 1 <br /> CP <br /> 36 <br /> e <br />
The URL can be used to link to this page
Your browser does not support the video tag.