Laserfiche WebLink
® APPROACH & METHODOLOGY PLAN <br /> ® Gino�'® <br /> ® Understanding the Type of Project <br /> The following is a list of current clients to which we are providing similar services under ( 1 <br /> ® a Continuing Services Contract. This is not a comprehensive list of prior clients. We •��4 — ! <br /> ® have a demonstrated track record with governmental and institutional clients at the • +_ <br /> federal, state, and local level. Our understanding of the contract is that we may be i �, , <br /> ® designing communitycenters, parkinggarages, and/or g g <br /> g g g g park design, site design, ! — <br /> ® planning, etc. We may also be asked to perform several service orders 'L'— • S'a= <br /> simultaneously,which we have successfully done in the past. _I-'ITN\ r — <br /> ® Client: Department of Military Affairs , <br /> I`%t?v ,b- _ <br /> 3 The Department of Military Affairs is a REPEAT CLIENT. The contract we hold is a new Kmt ' <br /> contract awarded in the year 2011. Current projects are being prepared under the li f.- �, c. _ _! <br /> ® prior contract, which is still active and includes the renovation of two armories in ,2I-' �� ; <br /> M.® Homestead, Florida and Miami, Florida. The work is being performed in accordance -,10,/,,/,0414 Y <br /> with the State guidelines and all deadlines have been met. Additionally, we ' f a <br /> 3 performed Design services through a Design/Build contract for the Department of 'r?� � <br /> Military Affairs.That was yet another contract. s"i^'"^" <br /> 410 <br /> . Client Miami Dade College <br /> Miami Dade College awarded us the first contract approximately 8 years ago; the - — <br /> ® initial term of the contract was three years and it was subsequently renewed two <br /> additional years. Under this contract we performed a variety of tasks and services. . <_"" <br /> ® Many of the tasks were small including the preparation of feasibility studies, ADA a,♦ Yn. <br /> .1 1 - <br /> retrofits. full design and construction documents for the renovation of the existing ‘rw-I�y __ <br /> ® science labs, space planning services, etc. Recently, we were awarded our second ' 7, <br /> ® contract with Miami Dade College. Miami Dade College is a REPEAT CLIENT, _-_. -; —_ <br /> testimony to a satisfied client. ,.- r t_� <br /> H <br /> Client University of Miami __ - e n <br /> ® We have been working for the University of Miami continuously since 2005. We utilize t+, ', — <br /> ® a Continuing Service Contract and they contact us with individual service orders on- r' 1 LI: <br /> demand, as needed. For the University of Miami, we have performed a variety of -> : ���r', P ' <br /> ® design services and tasks including but not limited to: Renovation of the Rainbow j ' I/ s\' <br /> Building (addressing red tag from the City of Coral Gables Fire Department for r _•,......--— n. —_ <br /> ® violations). In this project, we addressed all of the violations,redesigned the interior of _— - __- <br /> ® the space and also provided ADA accessibility to the second floor. We have also <br /> done a variety of space planning projects (small interior renovation projects) including <br /> ® upscale spaces for the Richter Library, Ashe Building (in front of the President's office), kg��, <br /> Pick Hall, Memorial Building, Cosford Theatre... Our largest project at the University of [ C- <br /> ® Miami has been ongoing work at the Memorial Building. While not yet designated 4, • _= <br /> ® historic by the City of Coral Gables, renovation and restoration work is being ��' <br /> undertaken in accordance with the best design practices to preserve and restore the !__ <br /> ® original architectural design features of the building. The University of Miami is also — <br /> REPEAT CLIENT since 2005. t jI <br /> ® <br /> Client Miami Dade County General Services Administration - —Y'.• 1 <br /> ® Currently we are completing two projects for GSA including the Historic Hampton <br /> • <br /> House Restoration Project and Wynwood Neighborhood Service Center. In both A 1,},i <br /> ® cases, these were extensive renovation projects with demolition, reconstruction i <br /> ® and/or new construction. The Historic Hampton House is locally designated with the <br /> Office of Archaeological and Historic Resources of Miami Dade County. The Historic <br /> ® Hampton House project has been a very challenging project to maintain the delicate <br /> ® historic, architectural features of the building, while maintaining Life Safety Greynolds Park Site <br /> requirements. GMPA prepared an Evaluation Report as part of the mitigation of the <br /> ® specific non-compliant code issues. Both projects are public assembly type spaces Analysis Diagram <br /> each with approximately 30,000 SF of gross area. Miami Dade County is also a REPEAT <br /> ® CLIENT for more than 15 years. <br /> O Gurri Matute PA/RFQ No. 12-04-02/Page 29 <br />