Laserfiche WebLink
HCM 2010 TWSC 15158 Future with Project AM <br />6: Collins Avenue & N Project Driveway 10/30/2015 <br />Varadero 10/30/2015 15158 Future with Project AM Synchro 9 Report <br />Page 1 <br />Intersection <br />Int Delay, s/veh 0.1 <br /> <br />Movement WBL WBR NBT NBR SBL SBT <br />Vol, veh/h 0 16 505 11 0 1422 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 <br />Sign Control Stop Stop Free Free Free Free <br />RT Channelized - None - None - None <br />Storage Length - 0 - - - - <br />Veh in Median Storage, # 0 - 0 - - 0 <br />Grade, % 0 - 0 - - 0 <br />Peak Hour Factor 92 92 92 92 92 92 <br />Heavy Vehicles, % 2 2 2 2 2 2 <br />Mvmt Flow 0 17 549 12 0 1546 <br /> <br />Major/Minor Minor1 Major1 Major2 <br />Conflicting Flow All 1173 280 0 0 561 0 <br /> Stage 1 555 - - - - - <br /> Stage 2 618 - - - - - <br />Critical Hdwy 6.29 6.94 - - 4.14 - <br />Critical Hdwy Stg 1 5.84 - - - - - <br />Critical Hdwy Stg 2 6.04 - - - - - <br />Follow-up Hdwy 3.67 3.32 - - 2.22 - <br />Pot Cap-1 Maneuver 217 717 - - 1006 - <br /> Stage 1 522 - - - - - <br /> Stage 2 469 - - - - - <br />Platoon blocked, %- - - <br />Mov Cap-1 Maneuver 217 717 - - 1006 - <br />Mov Cap-2 Maneuver 217 - - - - - <br /> Stage 1 522 - - - - - <br /> Stage 2 469 - - - - - <br /> <br />Approach WB NB SB <br />HCM Control Delay, s 10.1 <br />HCM LOS B <br /> <br />Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT <br />Capacity (veh/h) - - 717 1006 - <br />HCM Lane V/C Ratio - - 0.024 - - <br />HCM Control Delay (s) - - 10.1 0 - <br />HCM Lane LOS - - B A - <br />HCM 95th %tile Q(veh) - - 0 0 -