My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zoning Resolution 16-Z-158
SIBFL
>
City Clerk
>
Resolutions
>
Zoning
>
2016
>
Zoning Resolution 16-Z-158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2016 11:25:07 AM
Creation date
5/3/2016 2:10:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Zoning Resolution
Resolution Number
16-Z-158
Date (mm/dd/yyyy)
04/21/2016
Description
La Playa Beach Assoc, Varadero Project, 18801 Collins Ave. (Hrg#Z2016-03)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCM 2010 TWSC 15158 Future with Project PM <br />6: Collins Avenue & N Project Driveway 10/30/2015 <br />Varadero 10/30/2015 15158 Future with Project PM Synchro 9 Report <br />Page 1 <br />Intersection <br />Int Delay, s/veh 0 <br /> <br />Movement WBL WBR NBT NBR SBL SBT <br />Vol, veh/h 0 8 1079 29 0 1490 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 <br />Sign Control Stop Stop Free Free Free Free <br />RT Channelized - None - None - None <br />Storage Length - 0 - - - - <br />Veh in Median Storage, # 0 - 0 - - 0 <br />Grade, % 0 - 0 - - 0 <br />Peak Hour Factor 92 92 92 92 92 92 <br />Heavy Vehicles, % 2 2 2 2 2 2 <br />Mvmt Flow 0 9 1173 32 0 1620 <br /> <br />Major/Minor Minor1 Major1 Major2 <br />Conflicting Flow All 1837 602 0 0 1204 0 <br /> Stage 1 1189 - - - - - <br /> Stage 2 648 - - - - - <br />Critical Hdwy 6.29 6.94 - - 4.14 - <br />Critical Hdwy Stg 1 5.84 - - - - - <br />Critical Hdwy Stg 2 6.04 - - - - - <br />Follow-up Hdwy 3.67 3.32 - - 2.22 - <br />Pot Cap-1 Maneuver 88 443 - - 575 - <br /> Stage 1 246 - - - - - <br /> Stage 2 452 - - - - - <br />Platoon blocked, %- - - <br />Mov Cap-1 Maneuver 88 443 - - 575 - <br />Mov Cap-2 Maneuver 88 - - - - - <br /> Stage 1 246 - - - - - <br /> Stage 2 452 - - - - - <br /> <br />Approach WB NB SB <br />HCM Control Delay, s 13.3 <br />HCM LOS B <br /> <br />Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT <br />Capacity (veh/h) - - 443 575 - <br />HCM Lane V/C Ratio - - 0.02 - - <br />HCM Control Delay (s) - - 13.3 0 - <br />HCM Lane LOS - - B A - <br />HCM 95th %tile Q(veh) - - 0 0 -
The URL can be used to link to this page
Your browser does not support the video tag.