My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2540
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2540
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2016 4:29:02 PM
Creation date
6/27/2016 4:28:57 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2540
Date (mm/dd/yyyy)
04/21/2016
Description
5th Amd t Agmt w/Calvin Giordano (CGA) Pedestrian & Emergency Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Authorization No.175 <br /> March 1,2016 <br /> Calvin,Giordano&Associates,Inc.,Proposal No.15-7567 <br /> B. Maintain records of the Contractor's daily operations for each day <br /> inspectors are present onsite. <br /> C. Maintain drilled shaft installation inspections and logging. <br /> D. Manage services by a Geotechnical engineer to perform the Cross-Hole <br /> Sonic Logging Testing(CSL)on Structural Drill Shafts. <br /> E. Inspect concrete placement including verification of mix design,forms, <br /> and steel reinforcement. <br /> F. Perform all VT Concrete Testing as per the 2015 FDOT Standard <br /> Specifications and as stipulated in the contract. <br /> G. Inspect pre-stressed beams at the plant and at arrival to the site. <br /> H. Document the inspections for the temporary bracing. <br /> I. Inspect railing installation and obtain certification by manufacturer. <br /> J. Review and acceptance of the Contractor's Quality Control Plan(QCP). <br /> K. Review and acceptance of the Contractor's revision's to the QCP. <br /> L. Perform all VT Earthwork and Asphalt tests as stipulated in the 2015 <br /> FDOT Standard Specifications and the Contract Documents. <br /> M. Conduct a 60%, 90%and 100%Reviews and provide a detailed deficiency <br /> list to the Contractor. <br /> N. Document that all the ADA requirements have been incorporated <br /> according to the contract plans and shop drawings. <br /> 0. Observe and document removal of unsuitable material as designed by the <br /> contractor's specialty engineer. <br /> P. Verify compliance of the contractor's approved Storm Water Pollution <br /> Prevention Plan. <br /> Q. Inspect the contractor's implemented MOT plan to ensure compliance with <br /> the FDOT Standard Index. <br /> SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.