My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2540
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2540
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2016 4:29:02 PM
Creation date
6/27/2016 4:28:57 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2540
Date (mm/dd/yyyy)
04/21/2016
Description
5th Amd t Agmt w/Calvin Giordano (CGA) Pedestrian & Emergency Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Authorization No.175 <br /> March 1,2016 <br /> Calvin,Giordano&Associates,Inc.,Proposal No.15-7567 <br /> R. Inspect and monitor all bridge related items including end bent/interior <br /> bent construction, concrete beam erection, bridge deck construction,traffic <br /> railing construction,MSE wall construction, drill shaft installation and <br /> reinforcement inspection. <br /> S. Review and acceptance of the Contractor's Drilled Shaft Installation Plan <br /> (DSIP) and ensure that the following minimum information is included: <br /> 1. Name and experience record of drilled shaft superintendent or <br /> foreman in responsible charge of drilled shaft operations.Ensure the <br /> drilled shaft superintendent or foreman in responsible charge of the <br /> drilled shaft operations has a minimum of one year of experience of <br /> installing drilled shafts of the size and depth shown in the plans, and <br /> a minimum of three years' experience in the construction of drilled <br /> shafts using the following methods: <br /> • Mineral slurry. <br /> • Castings up to the length shown in the plans. <br /> • Shaft drilling operations on the water under conditions as <br /> shown in the plans. <br /> 2. Methods and equipment proposed to prevent displacement of casing <br /> and/or shafts during placement and compaction of fill. <br /> 3. List and size of proposed equipment, including cranes,drills,augers, <br /> bailing buckets, final cleaning equipment, de-sanding equipment, <br /> slurry pumps, core sampling equipment,tremies or concrete pumps, <br /> casings, etc. <br /> 4. Details of sequence of construction operations and sequence of shaft <br /> construction in bents or shaft groups. <br /> 5. Details of shaft excavation methods. <br /> 6. Details of slurry,including proposed methods to mix, circulate, de- <br /> sand, test methods, and proposed testing laboratory to document test <br /> results. <br /> 7. Details of proposed methods to clean shaft after initial excavation. <br /> S1B <br />
The URL can be used to link to this page
Your browser does not support the video tag.