Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Work Authorization No. 175 <br /> March 1,2016 <br /> Calvin,Giordano&Associates,inc.,Proposal No.15-7567 <br /> • Provide responses to Requests for Information(RFIs). <br /> • Submittal/Shop Drawing review and approval for the electrical <br /> equipment identified below. Includes one (1)round of initial <br /> submittals review and one(1) subsequent round of submittals <br /> review if resubmittal is determined to be necessary. <br /> - Conduit/Raceways <br /> - Conductors <br /> - Materials and methods <br /> • <br /> • <br /> - Identification <br /> - Panel Boards <br /> - Light Poles <br /> - Luminaires <br /> - Gate Controller <br /> - Transformer <br /> - Navigation Lights per U.S.C.G. <br /> • Issue clarifications and interpretations of the plans during the <br /> course of construction. <br /> • Attend construction meetings and perform electrical inspections <br /> to verify compliance with plans. Includes: one(1)pre- <br /> construction meeting, four(4)during-construction meetings, <br /> and one(1)post-construction/punch-list meeting. <br /> • Perform one (1)nighttime site visit after substantial completion <br /> and perform photometric readings to verify compliance with <br /> photometric plans. Does not include a detailed report or <br /> summary of the photometric readings—just a verification that <br /> the actual light levels produced match what is shown on the <br /> photometric plans. <br /> S B <br />