Laserfiche WebLink
Work Authorization No.175 <br /> March 1,2016 <br /> Calvin,Giordano&Associates,Inc.,Proposal No. 15-7567 <br /> • As-builts drawings review and approval. <br /> • Assist with design review, bidding,procurement,and <br /> construction administration for the FPL transformer relocation <br /> work. Includes review and comments of the design-build firm's <br /> 30,60,and 90%plans. Includes general coordination and <br /> technical assistance during the design process (limited to 16 <br /> hours). Includes general coordination and technical assistance <br /> during the bid and award process(limited to 8 hours). Includes <br /> general coordination,technical assistance,and attendance at <br /> four(4)construction/inspection meetings during the <br /> construction process(limited to 32 hours). <br /> 2. DOES NOT INCLUDE: <br /> • Any revisions to the construction contract documents due to <br /> unforeseen field conditions, client-initiated change orders, or <br /> errors/omissions in the construction contract documents. <br /> • Re-inspection of the as-built photometrics. Should the <br /> photometrics fail to meet the design,a subsequent fee will be <br /> due prior to re-inspection. <br /> • More than 2 reviews of the same shop drawing or submittal. <br /> Subsequent reviews of the same shop drawings or submittals <br /> beyond the second submittal will necessitate an additional <br /> review fee which shall be due and paid by the contractor at the <br /> time of the submittal. <br /> • Attendance at or preparation for any meetings not specifically <br /> identified above. <br /> • Any other work not specifically identified above. <br /> B. Civil Engineering <br /> 1. Provide Civil Engineering support services during the construction <br /> phase of the North Bay Road Pedestrian Emergency Bridge Project in <br /> Sunny Isles Beach,FL. Work consists of the following items: <br /> • Provide responses to Requests for Information(RFIs). <br /> SIB <br />