Laserfiche WebLink
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 <br />(1/2004) <br />MANDATORY USE DATE OF FORM 6/2004 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12 NAME <br />CHRIS GIORDANO, PE <br />13 ROLE IN THIS CONTRACT <br />CONTRACT MANAGER <br />14. YEARS EXPERIENCE <br />a TOTAL <br />11 <br />a TOTAL <br />6 <br />15 FIRM NAME AND LOCATION (City and State) <br />CALVIN, GIORDANO & ASSOCIATES, INC. – FORT LAUDERDALE, FLORIDA <br />16 EDUCATION (DEGREE AND SPECIALIZATION) <br />BSEET, ELECTRICAL ENGINEERING TECHNOLOGY, <br />CONCENTRATION ON COMPUTER SYSTEMS, <br />UNIVERSITY OF CENTRAL FLORIDA, ORLANDO, FL. 2005 <br />17 CURRENT PROFESSIONAL REGISTRATION <br />(STATE AND DISCIPLINE) <br /> FLORIDA SPECIALTY MARINE CONTRACTOR <br /> NO. SCC131151012 <br /> OSHA 10 HOUR CERTIFICATION <br />18 OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Chris Giordano has eleven years of municipal project management experience. After graduating from the University of <br />Central Florida with a Bachelor of Science in Electrical Engineering Technology, he pursued a career in the construction <br />management industry. Chris held the positions of Project Administrator, Project Manager, Contracts Manager, and finally <br />Project Controls Manager for the Orion Marine Group before leaving the construction industry to pursue other avenues. He <br />was then appointed the position of Project Administrator at Calvin, Giordano & Associat es and is currently the Director of <br />Management Services for CGA. Chris is a licensed contractor and OSHA certified. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Utility Rehabilitation Project <br />Surfside, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2008 <br />CONSTRUCTION (if applicable) <br />2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />CGA, acting as the Town Engineer, completed the required resea rch of existing conditions, Town projected growth and <br />permit requirements to design, permit and construct the Utility Rehabilitation Project to include upgrades and/or <br />replacements of the water distribution and services, wastewater gravity and force mains, wastewater pump stations, <br />drainage upgrades including 3 pump stations and the undergrounding of electrical conduit for a future FPL conversion <br />project. <br />b. <br />(1)TITLE AND LOCATION (City and State) <br />Community Center Demolition & Reconstruction <br />Surfside, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2006 <br />CONSTRUCTION (if applicable) <br />2010 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />CGA, acting as Project Manager, ushered the project through design, public outreach/input, permitting, construction <br />and closeout. The project called for a 7,000 sf single story building to be built to accept a future second story. The <br />project, which was designed east of the CCCL, also including 2 pools, a spa, interactive water features and a water slide. <br />This project was completed on budget and within the required schedule. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Mast Arm Conversions Phase I <br />Broward County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (if applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />This is a design build project to Provide professional engineering, design and construction services associated with the <br />conversion of span-wire supported traffic signal at 20 intersections all over Broward County. CGA as part of the design <br />build is providing engineering and design services, plans preparati on, field survey, utility coordination, permitting, <br />public involvement, coordination with adjoining projects, minor roadway reconstruction and paving, signing and <br />pavement marking, ADA compliant sidewalk reconstruction, traffic signal construction, install ation of underground <br />conduit and interconnect cable, installation of monitoring devices (video detection), installation of vehicle pre - <br />emption systems , as built record plans, and warranty necessary to provide the traffic signalization improvements in <br />accordance with Broward County and Florida Department of Transportation specifications. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />MOL Dames Point Container Terminal Expansion <br />Jacksonville, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />14