AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330
<br />(1/2004)
<br />MANDATORY USE DATE OF FORM 6/2004
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12 NAME
<br />CHRIS GIORDANO, PE
<br />13 ROLE IN THIS CONTRACT
<br />CONTRACT MANAGER
<br />14. YEARS EXPERIENCE
<br />a TOTAL
<br />11
<br />a TOTAL
<br />6
<br />15 FIRM NAME AND LOCATION (City and State)
<br />CALVIN, GIORDANO & ASSOCIATES, INC. – FORT LAUDERDALE, FLORIDA
<br />16 EDUCATION (DEGREE AND SPECIALIZATION)
<br />BSEET, ELECTRICAL ENGINEERING TECHNOLOGY,
<br />CONCENTRATION ON COMPUTER SYSTEMS,
<br />UNIVERSITY OF CENTRAL FLORIDA, ORLANDO, FL. 2005
<br />17 CURRENT PROFESSIONAL REGISTRATION
<br />(STATE AND DISCIPLINE)
<br /> FLORIDA SPECIALTY MARINE CONTRACTOR
<br /> NO. SCC131151012
<br /> OSHA 10 HOUR CERTIFICATION
<br />18 OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Chris Giordano has eleven years of municipal project management experience. After graduating from the University of
<br />Central Florida with a Bachelor of Science in Electrical Engineering Technology, he pursued a career in the construction
<br />management industry. Chris held the positions of Project Administrator, Project Manager, Contracts Manager, and finally
<br />Project Controls Manager for the Orion Marine Group before leaving the construction industry to pursue other avenues. He
<br />was then appointed the position of Project Administrator at Calvin, Giordano & Associat es and is currently the Director of
<br />Management Services for CGA. Chris is a licensed contractor and OSHA certified.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Utility Rehabilitation Project
<br />Surfside, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2008
<br />CONSTRUCTION (if applicable)
<br />2013
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />CGA, acting as the Town Engineer, completed the required resea rch of existing conditions, Town projected growth and
<br />permit requirements to design, permit and construct the Utility Rehabilitation Project to include upgrades and/or
<br />replacements of the water distribution and services, wastewater gravity and force mains, wastewater pump stations,
<br />drainage upgrades including 3 pump stations and the undergrounding of electrical conduit for a future FPL conversion
<br />project.
<br />b.
<br />(1)TITLE AND LOCATION (City and State)
<br />Community Center Demolition & Reconstruction
<br />Surfside, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2006
<br />CONSTRUCTION (if applicable)
<br />2010
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />CGA, acting as Project Manager, ushered the project through design, public outreach/input, permitting, construction
<br />and closeout. The project called for a 7,000 sf single story building to be built to accept a future second story. The
<br />project, which was designed east of the CCCL, also including 2 pools, a spa, interactive water features and a water slide.
<br />This project was completed on budget and within the required schedule.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Mast Arm Conversions Phase I
<br />Broward County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013
<br />CONSTRUCTION (if applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />This is a design build project to Provide professional engineering, design and construction services associated with the
<br />conversion of span-wire supported traffic signal at 20 intersections all over Broward County. CGA as part of the design
<br />build is providing engineering and design services, plans preparati on, field survey, utility coordination, permitting,
<br />public involvement, coordination with adjoining projects, minor roadway reconstruction and paving, signing and
<br />pavement marking, ADA compliant sidewalk reconstruction, traffic signal construction, install ation of underground
<br />conduit and interconnect cable, installation of monitoring devices (video detection), installation of vehicle pre -
<br />emption systems , as built record plans, and warranty necessary to provide the traffic signalization improvements in
<br />accordance with Broward County and Florida Department of Transportation specifications.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />MOL Dames Point Container Terminal Expansion
<br />Jacksonville, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />14
|