Laserfiche WebLink
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 <br />(1/2004) <br />MANDATORY USE DATE OF FORM 6/2004 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> Mr. Giordano was the Project Manager for a portion of the $198 Million Jaxport expansion project. Du e to ship traffic <br />schedules and involvement from the port pilots and private entities, this project carried with it a strict schedule with <br />heavy liquidated damages. Mr. Giordano was able to coordinate with numerous other contractors onsite to ensure the <br />2,000,000 CY of material were relocated to allow for the installation of a seawall and the upland construction container <br />terminal and gantry cranes. <br />15