My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc. RFQ 16-06-02
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-06-02) Landscape Architect Services (Final)
>
Responses
>
Calvin Giordano & Assoc. RFQ 16-06-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2016 12:22:57 PM
Creation date
7/18/2016 12:05:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 <br />(1/2004) <br />MANDATORY USE DATE OF FORM 6/2004 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> Mr. Giordano was the Project Manager for a portion of the $198 Million Jaxport expansion project. Du e to ship traffic <br />schedules and involvement from the port pilots and private entities, this project carried with it a strict schedule with <br />heavy liquidated damages. Mr. Giordano was able to coordinate with numerous other contractors onsite to ensure the <br />2,000,000 CY of material were relocated to allow for the installation of a seawall and the upland construction container <br />terminal and gantry cranes. <br />15
The URL can be used to link to this page
Your browser does not support the video tag.