AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330
<br />(1/2004)
<br />MANDATORY USE DATE OF FORM 6/2004
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12 NAME
<br /> GIANNO FEOLI
<br />13 ROLE IN THIS CONTRACT
<br /> LANDSCAPE URBANIST
<br />14. YEARS EXPERIENCE
<br />a TOTAL
<br />23
<br />b WITH CURRENT FIRM
<br />12
<br />15 FIRM NAME AND LOCATION (City and State)
<br /> CALVIN, GIORDANO & ASSOCIATES, INC. – FORT LAUDERDALE, FLORIDA
<br />16 EDUCATION (DEGREE AND SPECIALIZATION)
<br /> Master of Landscape Architecture, Florida International
<br /> University, School of Architecture, Miami, Florida
<br />B.A., Architectural Studies, Florida International University,
<br />School of Architecture, Miami, Florida
<br />17 CURRENT PROFESSIONAL REGISTRATION
<br />(STATE AND DISCIPLINE)
<br />18 OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Feoli leads the Landscape Department in creative design strategies for urban environments with specialties including
<br />urban design, contextual analysis and branding. He will contribute his experience in providing detailed site design, large -
<br />scale redevelopment planning, and graphic communication services. His experience has encompassed a wide array of
<br />project-types, and his strengths lie in park design, streetscapes and urban redevelopment, and form -based urban designs
<br />and planning strategies.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Middle Beach Recreational Corridor
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (if applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Lead Designer: responsible for coordinating all engineering and environmental efforts associated this 2-
<br />mile long linear multi-use trail project on State- owned lands, as well as responsible for all planting and
<br />hardscape design and public outreach. Conducted one-on-one meetings with over 39 condominium
<br />properties to gather support for the project, responded to residents’ concerns, and addressed design
<br />restrictions set forth in the Florida Administrative Code and balance those against resident's expectations.
<br />Responsible for coordinating with all State and local permitting agencies CGA’s fees: $534,000.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Oakland Park Station
<br />Oakland Park, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (if applicable)
<br />2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Responsible for all conceptual design, site, design and construction detailing of a public plaza at the
<br />terminus of the City's culinary district. The design effectively created flexible public environment that
<br />could be used as event spaces and could accommodate the needs of the City in continuing its adopted
<br />branding through the use of elements, furnishings, paver palettes and landscape lighting. The project's
<br />challenging shallow dimensions required innovative solutions to address ADA access to adjacent buildings
<br />while maximizing opportunities for the use of space, addressed through the creation of large stage
<br />settings that served as landings and allowed for public engagement and interaction. CGA’s fees: $25,000.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />98th Street Park
<br />Bay Harbor Islands, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (if applicable)
<br />2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Responsible for all public outreach, site design, construction detailing, and planting design of a
<br />neighborhood passive park. The park includes a small dog park area, flexible open space, children's play
<br />areas, an interactive water feature and a restroom facility. Designed the splash pad, play areas, and
<br />landscaping. Coordinated the design of the restroom facility and facilitated all necessary public outreach
<br />through both the Parks and Recreation Committee and the Town Council. CGA’s fees: $42,000.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lloyds Estate Pocket Park Project
<br />Oakland Park, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (if applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Responsible for the programming and design of the project site, conducting the necessary public
<br />outreach to gather Commission approval and coordinating important aesthetic and sustainable
<br />17
|