Laserfiche WebLink
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 <br />(1/2004) <br />MANDATORY USE DATE OF FORM 6/2004 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />ERIC CZERNIEJEWSKI <br />13.ROLE IN THIS CONTRACT <br />TRAFFIC ENGINEERING <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />18 b. WITH CURRENT FIRM <br />1 <br />15. FIRM NAME AND LOCATION (City and State) <br />CALVIN, GIORDANO & ASSOCIATES, INC. – FORT LAUDERDALE, FLORIDA <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />BS, CIVIL ENGINEERING, SOUTHERN ILLINOIS UNIVERSITY <br />17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />PE LICENSE (#58002) FLORIDA <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Eric Czerniejewski, PE, is the Director of Traffic Engineering for CGA with 18 years of experience in transportati on <br />infrastructure design, traffic engineering and transportation planning. He has experience in transportation projects that <br />include preparation of traffic studies including corridor studies, traffic impact studies, mobility studies and parking <br />utilization and reduction studies. He is also specialized in signalization design, roadway design, managing, designing and <br />permitting select transportation infrastructure engineering projects; planning, developing and coordinating civil <br />engineering design documents; and coordinating construction engineering and inspection. Some of his relevant mobility <br />plan experience includes development of citywide mobility plan for the City of Fort Lauderdale, preparation of the campus <br />master mobility plans for Florida International University and Florida Atlantic University campuses as well as Memorial <br />Health Care Joe DiMaggio Hospital campus. He is certified to prepare traffic control plans and process LAP projects by <br />FDOT. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />City of West Palm Beach Traffic Engineering Continuing <br />Services Contract, West Palm Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2008 <br />CONSTRUCTION (if applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager on this Continuing Services Contract serving as Engineer of Record for task work orders. Provided a <br />variety of traffic and transportation consulting services to the City of West Palm Beach including intersection studies, <br />corridor studies, traffic concurrency studies, traffic calming design, pavement analysis, pavement evaluation study, <br />signing and marking plans, and evaluation of the comprehensive plan transportation ele ment, just to name a few. <br />CGA’s fees: $200,000. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Memorial Regional Hospital Supplemental Traffic Review, <br />Hollywood, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2008 <br />CONSTRUCTION (if applicable) <br />2009 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager and Traffic Engineer providing independent review of the 2007 traffic impact analysis for the <br />expansion of the Memorial Regional Hospital/Joe DiMaggio Children’s Hospital. This review determined the traffic <br />impacts created by the proposed hospital expansion at nine additional intersections as well as determined if the <br />proposed transportation improvement plan best accommodated the future traffic impacts created by the proposed <br />hospital expansion. Services provided included: research of existing conditions and coordination with key <br />stakeholders, traffic data collection at nine intersections, traffic analysis of four scenarios for the year 2017 future <br />conditions, supplemental traffic improvement plan and summary report, and meeting attendance. Findings included <br />alternative recommendations for the mitigation improvements at certain intersections within the project study area. <br />CGA’s fees: $50,000. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />City of Fort Lauderdale Professional Traffic & Transportation <br />Engineering Services, Fort Lauderdale, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (if applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager on this Continuing Services Contract serving as Engineer of Record for task work orders. The <br />Consultant has a continuing contract for Professional Traffic and Transportation Engineering Services for four years to <br />provide a variety of traffic and transportation engineering services including transit planning, traffic data collection as <br />well as site planning services. CGA’s fees: $80,000. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Mast Arm Conversion Group Phases I&II- Horsepower <br />Electric, Broward County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (if applicable) <br />Ongoing <br />22