AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330
<br />(1/2004)
<br />MANDATORY USE DATE OF FORM 6/2004
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />ERIC CZERNIEJEWSKI
<br />13.ROLE IN THIS CONTRACT
<br />TRAFFIC ENGINEERING
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />18 b. WITH CURRENT FIRM
<br />1
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CALVIN, GIORDANO & ASSOCIATES, INC. – FORT LAUDERDALE, FLORIDA
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />BS, CIVIL ENGINEERING, SOUTHERN ILLINOIS UNIVERSITY
<br />17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />PE LICENSE (#58002) FLORIDA
<br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Eric Czerniejewski, PE, is the Director of Traffic Engineering for CGA with 18 years of experience in transportati on
<br />infrastructure design, traffic engineering and transportation planning. He has experience in transportation projects that
<br />include preparation of traffic studies including corridor studies, traffic impact studies, mobility studies and parking
<br />utilization and reduction studies. He is also specialized in signalization design, roadway design, managing, designing and
<br />permitting select transportation infrastructure engineering projects; planning, developing and coordinating civil
<br />engineering design documents; and coordinating construction engineering and inspection. Some of his relevant mobility
<br />plan experience includes development of citywide mobility plan for the City of Fort Lauderdale, preparation of the campus
<br />master mobility plans for Florida International University and Florida Atlantic University campuses as well as Memorial
<br />Health Care Joe DiMaggio Hospital campus. He is certified to prepare traffic control plans and process LAP projects by
<br />FDOT.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of West Palm Beach Traffic Engineering Continuing
<br />Services Contract, West Palm Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2008
<br />CONSTRUCTION (if applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager on this Continuing Services Contract serving as Engineer of Record for task work orders. Provided a
<br />variety of traffic and transportation consulting services to the City of West Palm Beach including intersection studies,
<br />corridor studies, traffic concurrency studies, traffic calming design, pavement analysis, pavement evaluation study,
<br />signing and marking plans, and evaluation of the comprehensive plan transportation ele ment, just to name a few.
<br />CGA’s fees: $200,000.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Memorial Regional Hospital Supplemental Traffic Review,
<br />Hollywood, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2008
<br />CONSTRUCTION (if applicable)
<br />2009
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager and Traffic Engineer providing independent review of the 2007 traffic impact analysis for the
<br />expansion of the Memorial Regional Hospital/Joe DiMaggio Children’s Hospital. This review determined the traffic
<br />impacts created by the proposed hospital expansion at nine additional intersections as well as determined if the
<br />proposed transportation improvement plan best accommodated the future traffic impacts created by the proposed
<br />hospital expansion. Services provided included: research of existing conditions and coordination with key
<br />stakeholders, traffic data collection at nine intersections, traffic analysis of four scenarios for the year 2017 future
<br />conditions, supplemental traffic improvement plan and summary report, and meeting attendance. Findings included
<br />alternative recommendations for the mitigation improvements at certain intersections within the project study area.
<br />CGA’s fees: $50,000.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Fort Lauderdale Professional Traffic & Transportation
<br />Engineering Services, Fort Lauderdale, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011
<br />CONSTRUCTION (if applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager on this Continuing Services Contract serving as Engineer of Record for task work orders. The
<br />Consultant has a continuing contract for Professional Traffic and Transportation Engineering Services for four years to
<br />provide a variety of traffic and transportation engineering services including transit planning, traffic data collection as
<br />well as site planning services. CGA’s fees: $80,000.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Mast Arm Conversion Group Phases I&II- Horsepower
<br />Electric, Broward County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013
<br />CONSTRUCTION (if applicable)
<br />Ongoing
<br />22
|