My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2002-442
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2002
>
Reso 2002-442
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2013 10:10:36 AM
Creation date
1/25/2006 1:57:03 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2002-442
Date (mm/dd/yyyy)
05/14/2002
Description
– Bid #02-03-01, Vila & Son Landscaping for Landscp Impr. Collins Ave.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />A Preparation <br /> <br />1. Spread 2'; topsoil mixture as specified in paragraph 2.01 B, prior to laying of sod. <br /> <br />B. St. Augustine Sodding Procedures <br /> <br />1. Sodding shall be done as soon as practical following finish grading. Five lbs. of 4-12-12 <br />commercial fertilizer, with all minor nutrients, shall be spread per 100 sq. ft. of finished <br />subgrade and lightly raked in. Ground shall be leveled with the back of a rake and sod laid <br />with joints closely butted so no voids are visible, keeping surface of sod flush with the <br />adjoining seeded areas and or pavements. <br /> <br />2. After sod is in place it shall be top dressed with sufficient sharp, clean sand, free of weeds or <br />weed seeds, to fill all voids remaining and thoroughly watered to wash the top dressing into <br />the sodded surface. The completed sodded surface shall be true to finish grade indicated on <br />the plans, even and firm at all points. Contractor shall keep new sod properly watered until <br />final acceptance. <br /> <br />3. Protect sodded areas against trespassing and damage of any kind for the duration of <br />maintenance period. <br /> <br />4. Sodded areas shall be planted a minimum of one month prior to final subgrade. <br /> <br />3.07 CONSTRUCTION REVIEW: <br /> <br />A In addition to other progress construction reviews, the CONTRACTOR shall schedule and facilitate <br />the following subtrade related reviews, giving the CONSULTANT at least 48 hours before notice. <br /> <br />1. Review of proposed tree pit locations, as represented by staking. <br /> <br />2. Review, upon delivery, of plant materials at the site to verify species, vigor, size, condition, <br />shape, quantity, in compliance with specifications and drawings. <br /> <br />3. Review of tree pit excavation and fine subgrade. <br /> <br />4. Review of all backfilling for palm and tree pits as well as the placement of the soil blanket. <br /> <br />5. Review of Work and materials after completion of planting. This review shall be scheduled <br />sufficiently in advance and in cooperation with the CONSULTANT so that it may be <br />conducted within 48 (forty-eight) hours after completion of planting. <br /> <br />6. Review after a 3~-day (thirty) period of maintenance, upon written request by the <br />CONTRACTOR Request shall be received at least five days before anticipated date of <br />reV1ew. <br /> <br />7. Review for final acceptance. <br /> <br />3.08 MAINTENANCE <br /> <br />A General: The CONTRACTOR shall maintain all planting, starting at the time of planting and <br />continuing until all planting is complete and accepted by the CONSULTANT. <br /> <br />02900-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.