My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2002-442
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2002
>
Reso 2002-442
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2013 10:10:36 AM
Creation date
1/25/2006 1:57:03 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2002-442
Date (mm/dd/yyyy)
05/14/2002
Description
– Bid #02-03-01, Vila & Son Landscaping for Landscp Impr. Collins Ave.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />advance of relocation. Brace trees, as required, for support after rootpruning. <br /> <br />C. Limits of Warranty - Damage by Others <br /> <br />1. Hurricane winds causing damage to relocated plants, or other acts of GOD shall not be <br />responsibility of CONTRACTOR. <br />2. Relocated trees are not included in the warranty for this project. <br /> <br />1. 05 SUBMITTALS <br /> <br />A. CONTRACTOR to submit list of proposed equipment to be used in relocations, and qualifications of <br />personnel as applicable, for approval. <br /> <br />B. CONTRACTOR shall apply for and secure any and all tree relocation or removal permits required by <br />the CITY or other governing body. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.01 MATERIALS <br /> <br />A CONTRACTOR shall provide clean fresh water as required until Final Acceptance of tree relocation. <br /> <br />B. CONTRACTOR to provide nutrients, bracing, and other materials necessary for tree relocation <br />operations. <br /> <br />1. See Section 02900 - Landscaping for fertilizer and soil amendment specifications for Work <br />of this section. <br /> <br />C. CONTRACTOR to provide clean fill as required to bring palm pits resulting from relocation operations <br />back to flush condition with surrounding grade. <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 PLANTING OPERATIONS <br /> <br />A. Trees should be rootpruned a minimum of six (6) weeks in advance of relocation, unless otherwise <br />approved in writing by CONSULTANT. <br /> <br />B. Trees shall be properly prepared and handled during moving to prevent damage, drying/desiccation or <br />breakage of rootball; scarring or breakage to trunk and limbs; or desiccation of foliage. Improperly <br />handled, or damaged material shall be subject to rejection by the CONSULTANT and replacement in <br />kind at the CONTRACTOR'S expense. <br /> <br />C. Trees shall be replanted as soon as possible after digging. No tree shall be kept out of the ground <br />longer than six hours. While digging, carefully protect all rootball of trees from sun, wind and drying. <br /> <br />D. Backfill all pits resulting from relocation operations immediately, to make flush with surrounding grade. <br />CONTRACTOR shall be responsible for stabilizing grade if required, and for correcting problems <br />caused by erosion, wind etc., in the area where digging has occurred. <br /> <br />E. See Section 02900 - Landscaping for installation requirements of this section. <br /> <br />02910-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.