Laserfiche WebLink
<br />3.02 MAINTENANCE <br /> <br />A Clean Up: CONTRACTOR to provide clean up and removal of debris as required after operations for <br />tree relocation. <br /> <br />B. Temporary Watering: Thoroughly soak root zone of relocated material until tree relocation is complete <br />and accepted by CONSULTANT. It will be the CONTRACTOR'S responsibility to water all relocated <br />plant material, in sufficient quantity to promote vigorous growth, until the irrigation system is fully <br />operational. <br /> <br />END OF SECTION <br /> <br />02910-3 <br />