<br />pavement markings and list of pay items plans. The following is the list of plans to be <br />revised: <br /> <br />1.- Typical Sections <br />2.- Summary of Quantities <br />3.- Plan and Profile North Bay Road <br />4.- Plan and Profile NE 183rd Street <br />5.- Plan and Profile Atlantic Boulevard <br />6.- Plan and Profile NE 178th Street <br />7.- Plan and Profile NE 178th Drive <br />8.- Summary of Drainage Structures <br />9.- Cross Sections <br />10.- Signing and Marking Plans <br />11.- Signing Summary of Quantities <br />12.- Topographical Survey (3 man crew) <br /> <br />3 Sheets <br />1 Sheet <br />6 Sheets <br />1 Sheet," <br />3 Sheet <br />1 Sheet l'" <br />2 Sheets v~ <br />2 Sheets,'" <br />24 Sheets l <br />13 Sheets, <br />1 Sheet v/ <br />2 Party Days <br /> <br />TOTAL (Number of sheets to be revised) <br /> <br />57 Sheets <br /> <br />Deliverables <br /> <br />Upon completion BHA will deliver completed set of plans with the revisions, including <br />typical sections, plan and profile, cross sections, signing and marking and summary of <br />pay items sheets. In addition, BHA will prepare a new construction cost estimate. <br /> <br />Time for completion <br /> <br />The estimated time for completion of the revisions to the construction plans is estimated <br />to be two (2) months from the "Notice to Proceed". <br /> <br />Fee Proposal: <br /> <br />The Cost Proposal for the described scope of services and deliverables is: <br /> <br /> Project Man Hours <br /> Sheets Manager Engineer Drafting <br />1.- Typical Sections 3 4.0 4.0 <br />2.- Summary of Pay Items 1 16.0 4.0 <br />3.- Plan and Profile North Bay Rd. 6 24.0 16.0 <br />4.- Plan and Profile NE 183rd St. 1 4.0 4.0 <br />5.- Plan and Profile Atlantic Blvd. 3 16.0 16.0 <br />6.- Plan and Profile NE 178lh St. 1 4.0 4.0 <br />7.- Plan and Profile NE 178th Dr. 2 8.0 4.0 <br />8.- Summary of Drainage Structures 2 24.0 8.0 <br />9.- Cross Sections 24 16.0 16.0 <br />10.- Signing and Marking Plans 13 40.0 60.0 <br />11.- Signing Summary of Quantities 1 16.0 8.0 <br />12.- Project Management 24.0 <br />TOTAL HOURS 24.0 172.0 144.0 S\B <br /> <br />Beiswenger, Hoch and Associates, Inc. <br />