My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-825
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-825
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 10:15:50 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-825
Date (mm/dd/yyyy)
09/08/2005
Description
– Ratify Agmt w/Siltek Group Inc., Construction of 181st Drive Active Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br />u <br /> <br />n <br />LJ <br /> <br />n <br /> <br />u <br /> <br />I' <br /> <br />u <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />i' <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br />u <br /> <br />r> <br /> <br />u <br /> <br />n <br />u <br /> <br />n <br />u <br /> <br />n <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br />u <br /> <br />181ST ACTIVE PARK <br /> <br />Julv 19APRIL 10, 2005 <br /> <br />~ % (with the balance being retainage) of materials and equipment not <br />incorporated in the Work (but delivered, suitably stored and accompanied by <br />documentation satisfactory to OWNER as provided in paragraph 14.02 of <br />the General Conditions and within Section 9-6.5 partial payments as <br />provided in FOOT Standard Specifications for Road and Bridge Construction. <br /> <br />5.1.2. When circumstances beyond the CONTRACTORS control arise (as <br />determined by the OWNER) the OWNER may allow the total payment to the <br />CONTRACTOR to increase to 98% of the contract price (with the balance being <br />retainage), less such amounts as ENGINEER shall determine, only after receipt of the <br />final as-builts and upon substantial completion of the project and in accordance with <br />Paragraph 14.02 of the General Conditions. <br /> <br />5.2. Final Payment. Upon final completion and acceptance of the Work in accordance with <br />paragraph 14.07 of the General Conditions, OWNER shall pay the remainder of the Contract <br />Price as recommended by ENGINEER as provided in said paragraph 14.07. <br /> <br />Article 6. INTEREST. (Not Applicable) <br /> <br />Article 7. CONTRACTOR'S REPRESENT A TlONS. <br /> <br />In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following <br />representations: <br /> <br />7. 1. CONTRACTOR has examined and carefully studied the Contract Documents (including <br />the Addenda listed in paragraph 8) and the other related data identified in the Bidding <br />Documents including "technical data." <br /> <br />7.2. CONTRACTOR has visited the site and become familiar with and is satisfied as to the <br />general, local and site conditions that may affect cost, progress, performance or furnishing of <br />the Work. <br /> <br />7.3. CONTRACTOR is familiar with and is satisfied as to all federal, state and local Laws and <br />Regulations that may affect cost, progress, performance and furnishing of the Work. <br /> <br />7.4. CONTRACTOR has carefully studied all reports of explorations and tests of subsurface <br />conditions at or contiguous to the site and all drawings of physical conditions in or relating to <br />existing surface or subsurface structures at or contiguous to the site (except Underground <br />Facilities) which have been identified in the Supplementary Conditions as provided in <br />paragraph 4.2.1. of the General Conditions. CONTRACTOR accepts the determination set <br />forth in paragraph SC-4.2 of the Supplementary Conditions of the extend of the "technical <br />data" contained in such reports and drawings upon which CONTRACTOR is entitled to rely as <br />provided in paragraph 4.2 of the General Conditions. CONTRACTOR acknowledges that such <br />reports and drawings are not Contract Documents and may not be complete for <br />CONTRACTOR's purposes. CONTRACTOR acknowledges that OWNER and ENGINEER do not <br />assume responsibility for the accuracy or completeness of information and data shown or <br />indicated in the Contract Documents with respect to Underground Facilities at or contiguous <br />to the site. CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br />having done so) all such additional supplementary examinations, investigations, explorations, <br />tests, studies and data concerning conditions (surface, subsurface and Underground <br />Facilities) at or contiguous to the site or otherwise which may affect cost, progress, <br />performance or furnishing of the Work or which relate to any aspect of the means, methods, <br />techniques, sequences and procedures of construction to be employed by CONTRACTOR and <br />safety precautions and programs incident thereto. CONTRACTOR does not consider that any <br />additional examinations, investigations, explorations, tests, studies or data are necessary for <br /> <br />EJCDC STANDARD FORM OF AGREEMENT <br /> <br />00500-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.