My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-825
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-825
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 10:15:50 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-825
Date (mm/dd/yyyy)
09/08/2005
Description
– Ratify Agmt w/Siltek Group Inc., Construction of 181st Drive Active Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />fl <br />~ <br /> <br />1818T ACTIVE PARK <br /> <br />Julv 19APRIl1 0, 2005 <br /> <br />r <br />LJ <br /> <br />the performance and furnishing of the Work at the contract Price, within the Contract Times <br />and in accordance with the other terms and conditions of the Contract Documents. <br /> <br />I' <br />G <br /> <br />7.5. CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br />others at the site that relates to the Work as indicated in the Contract Documents. <br /> <br />r <br />u <br /> <br />7.6. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the site, reports and drawings identified in the Contract <br />Documents and all additional examinations, investigations, explorations, tests, studies and <br />data with the Contract Documents. <br /> <br />c <br /> <br />7.7. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities or <br />discrepancies that CONTRACTOR has discovered in the Contract Documents and the written <br />resolution thereof by ENGINEER is acceptable to CONTRACTOR, and the Contract Documents <br />are generally sufficient to indicate and convey understanding of all terms and conditions for <br />performance and furnishing of the Work. <br /> <br />r <br />LJ <br /> <br />Article 8. CONTRACT DOCUMENTS. <br /> <br />fI <br />LJ The Contract Documents which comprise the entire agreement between OWNER and <br />CONTRACTOR concerning the Work consist of the following: <br /> <br />fl <br />\ <br />LJ <br /> <br />8.1. This Agreement (pages 1 toJl inclusive). <br /> <br />c <br /> <br />8.2. Exhibits to this Agreement (page) A inclusive). <br /> <br />n <br />~ <br /> <br />8.3. Performance, Payment, and other Bonds, identified as exhibits 00600 and 00601 <br />and consisting of ~ pages. <br /> <br />8.4. Notice to Proceed, <br /> <br />fI <br />L <br /> <br />8.5. General Conditions (pages 00700-1 to 00700-42. inclusive). <br /> <br />fI <br />U <br /> <br />8.6. Supplementary Conditions (pages 00800-1 to 00800-7, inclusive) and any <br />amendments thereto. <br /> <br />c <br /> <br />8.7. Specifications bearing the title 181" Drive Active Park, Proiect Manual Vol. 1 & 2 <br />and consisting of 1 6 divisions. <br /> <br />8.B. Drawings consisting of a cover sheet and sheets numbered as specified in the <br />Drawing Index INX-l . <br /> <br />n <br />I <br />LJ <br /> <br />8.9. Addenda 1, 2. 3, 4 and 5, inclusive. <br /> <br />c <br /> <br />8.10. CONTRACTOR's Bid. <br /> <br />fI <br />~ <br /> <br />B.11. Documentation submitted by CONTRACTOR prior to Notice of Award (pages N/A to <br />N/A inclusive), <br /> <br />c <br /> <br />B. 12. 8. 12. The following which may be delivered or issued after the Effective <br />Date of the Agreement and are not attached hereto: All Written Amendments and <br />other documents amending, modifying or supplementing the Contract Documents <br />pursuant to paragraph 3.04 of the General Conditions. <br /> <br />n <br />~ <br /> <br />EJCDC STANDARD FORM OF AGREEMENT <br /> <br />00500-4 <br /> <br />c <br />
The URL can be used to link to this page
Your browser does not support the video tag.